A kind of fast plugging method of embankment breach
A fast and plugging technology, applied in marine engineering, construction, water conservancy projects, etc., can solve the problems of increasing construction difficulty and progress, higher requirements for riprap and head wrapping, and self-heavy weight, so as to reduce property loss and construction. Difficulty, light weight effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] figure 1 and figure 2 It shows a rapid closure system for a dam breach when the arched member 11 is vertically arranged, including the arched member 11 across the Helongkou 1, and the arched member 11 is assembled by several prefabricated members 4 (light steel) The two ends of the arched member 11 are fastened to the embankment 10 through the fasteners 3 respectively; wherein, the closing mouth 1 is obtained after quickly blocking the breach.
[0032] There are two prefabricated components 4, and the two are connected by a connecting piece 6.
[0033] The Helongkou 1 is filled with a layer of riprap wrapping the head 9 .
[0034] The arched member 11 is provided with an electric hoist 7 , which is connected to the throwing material on the embankment 10 through a winding rope 8 , thereby transporting the throwing material to the arched member 11 .
[0035] The arched member 11 is arranged vertically. The arched member 11 is provided with a horizontal support frame ...
Embodiment 2
[0043] image 3 It shows a rapid plugging system for a dam breach when the arched member 11 is inclined to the upstream direction, and its structure is the same as that of figure 1 and figure 2 Similarly, it includes an arched member 11 across the Helongkou 1. The arched member 11 is assembled from several prefabricated members 4 (light steel), and the two ends of the arched member 11 are fastened to the embankment 10 by fasteners 3 respectively. Connection; Among them, the closing mouth 1 is obtained after quickly blocking the breach.
[0044] There are two prefabricated components 4, and the two are connected by a connecting piece 6.
[0045] The Helongkou 1 is filled with a layer of riprap wrapping the head 9 .
[0046] The arched member 11 is provided with an electric hoist 7 , which is connected to the throwing material on the embankment 10 through a winding rope 8 , thereby transporting the throwing material to the arched member 11 .
[0047] The arched member 11 is...
Embodiment 3
[0055] Figure 4It is a rapid plugging system for embankment breach when the arched member 11 is inclined to the upstream direction and the high-strength braid 12 is fixed on the bottom side of the arched member 11. Its basic structure is the same as that of figure 1 and figure 2 Similarly, it includes an arched member 11 across the Helongkou 1. The arched member 11 is assembled from several prefabricated members 4 (light steel), and the two ends of the arched member 11 are fastened to the embankment 10 by fasteners 3 respectively. Connection; Among them, the closing mouth 1 is obtained after quickly standing and blocking the breaching mouth.
[0056] There are two prefabricated components 4, and the two are connected by a connecting piece 6.
[0057] The Helongkou 1 is filled with a layer of riprap wrapping the head 9 .
[0058] The arched member 11 is provided with an electric hoist 7 , which is connected to the throwing material on the embankment 10 through a winding ro...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



