Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Timing constraint checking method

A technology of timing constraints and inspection methods, which is applied in the directions of instruments, calculations, and electrical digital data processing, etc., and can solve problems such as labor costs, late timing constraints, and large impact of errors

Active Publication Date: 2017-02-15
SPREADTRUM COMM (SHANGHAI) CO LTD
View PDF4 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] According to the problems existing in the prior art, a technical scheme of a timing constraint checking method is now provided, which aims to advance the timing constraint checking process to the same time as the wiring and placement process, and solve the timing constraint problem and cause errors caused by late discovery. , need to pay extra manpower cost and other issues

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Timing constraint checking method
  • Timing constraint checking method
  • Timing constraint checking method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0058] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0059] It should be noted that, in the case of no conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.

[0060] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but not as a limitation of the present invention.

[0061] The timing inspection process of the existing IC layout design is as follows: figure 1 As shown, can inc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a timing constraint checking method, and belongs to the technical field of layout design. The method comprises the following steps of: A1: according to a hardware code related to the layout design, carrying out processing to obtain a corresponding netlist; A2: according to the netlist, carrying out simulation to generate corresponding standard delay data; A3: according to the standard delay data, carrying out a post simulation operation on the layout design so as to match with a timing constraint file used for representing the design constraint of the layout design, and outputting a matching result; A4: according to the matching result, regulating the timing constraint file until the matching result expresses that post simulation is qualified, and then, turning to A5; and A5: carrying out corresponding timing checking on the layout design, and exiting. The above technical scheme has the beneficial effects that a timing constraint checking process is brought forward to be simultaneously carried out with a P&R (Place& Route) process, and the problems that an error influence is great and extra human cost needs to be paid since a timing constraint problem is found too late are solved.

Description

technical field [0001] The invention relates to the technical field of layout design, in particular to a timing constraint checking method. Background technique [0002] In the existing technical field of layout design of integrated circuits, timing constraint checking for layout design usually needs to be performed after wiring and placement. In other words, in the prior art, the execution time of the timing constraint check for the layout design is later and closer to the final tape-out process. If there is a problem in the timing constraint inspection, it will have a huge impact because it is closer to the chip tape-out process, which will generally lead to a delay in chip tape-out, and more additional labor costs will be paid for this. Contents of the invention [0003] According to the problems existing in the prior art, a technical scheme of a timing constraint checking method is now provided, which aims to advance the timing constraint checking process to the same ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50
Inventor 肖斌
Owner SPREADTRUM COMM (SHANGHAI) CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products