Pre-stack time migration method and device
A pre-stack time migration and parallel algorithm technology, applied in the field of geological exploration, can solve the problems of large traffic of seismic data network, no solution proposed, and long time migration processing period.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0048] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be described in further detail below in conjunction with the embodiments and accompanying drawings. Here, the exemplary embodiments and descriptions of the present invention are used to explain the present invention, but not to limit the present invention.
[0049] The inventor considers that the three parallel algorithms of pre-stack time offset, common offset, input channel and output channel can be combined together, and considering the architecture of PC_Cluster distributed memory, the three algorithms are respectively applied between node groups, In the node group and node, a highly scalable pre-stack time migration algorithm is invented. Through the pre-stack time migration algorithm, the parallel scale can be expanded from 100 nodes to 1000 nodes and above, so as to shorten the stack time. Purpose of pre-time offset calculation cycle.
[00...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


