Short-term power prediction method used for newly-built wind farm

A power forecasting and short-term forecasting technology, which is applied in forecasting, data processing applications, neural learning methods, etc., can solve the problem of the inability to establish a high-precision short-term power forecasting model, affecting the short-term power forecasting accuracy of new wind farms, and the lack of historical operating data of wind farms And other issues

Inactive Publication Date: 2017-05-10
ZHONGNENG POWER TECH DEV
View PDF3 Cites 13 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In recent years, with the rapid development of wind power generation in my country, a large number of new wind farms have been put into operation in a short period of time. These wind farms lack accurate and reliable historical operating data, and cannot establish high-precision short-term power prediction models through traditional statistical modeling methods. Greatly affects the short-term power forecast accuracy of new wind farms

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Short-term power prediction method used for newly-built wind farm
  • Short-term power prediction method used for newly-built wind farm
  • Short-term power prediction method used for newly-built wind farm

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] In order to overcome the defects existing in the prior art, the present invention provides a short-term power prediction method applied to new wind farms. By performing downscaling calculations on the predicted output of the mesoscale model, the height of the hub at the position of the anemometer tower in the early stage of the wind farm is obtained. Short-term prediction of wind speed, and then based on the analytical function of the wind speed-power characteristic curve and the power consumption ratio of the wind farm comprehensive plant to establish a short-term power prediction model of the new wind farm to realize short-term prediction of the overall output of the wind farm. The above prediction method effectively reduces the uncertainty caused by insufficient mesoscale resolution, and the shortcomings of the lack of a large amount of historical operating data for new wind farms, which leads to the inability to establish high-precision statistical models, and signifi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a short-term power prediction method used for a newly-built wind farm. The short-term power prediction method comprises steps that A: by using a BP neural network, a historical data relation between a scale value weather forecast prediction factor in the newly-built wind farm and a wind farm early-stage anemometer tower actually-measured wind speed is established, and a wind speed statistic downscaling model of an anemometer tower position draught fan hub height is generated; B: the short-term prediction wind speed of the anemometer tower position draught fan hub height is generated according to the prediction factor of the scale value weather forecast in the wind farm area and the wind speed statistic downscaling model of the anemometer tower position draught fan hub height of the step A; C: a newly-built wind farm short-term power prediction model is established according to a wind speed-power characteristic curve analysis data and a wind farm integrated factory electricity loss proportion, and newly-built wind farm short-term prediction power is calculated. Newly-built wind farm integrated output short-term prediction is realized.

Description

technical field [0001] The invention relates to the technical field of wind farm power forecasting, in particular to a short-term power forecasting method applied to newly built wind farms. Background technique [0002] In recent years, with the rapid development of wind power generation in my country, a large number of new wind farms have been put into operation in a short period of time. These wind farms lack accurate and reliable historical operating data, and cannot establish high-precision short-term power prediction models through traditional statistical modeling methods. It greatly affects the short-term power prediction accuracy of new wind farms. In order to ensure safe, reliable and efficient grid-connected operation of large-scale wind power, it is very important to develop a wind power prediction system that meets engineering applications. Contents of the invention [0003] In view of this, the main purpose of the present invention is to provide a short-term po...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06N3/08
CPCG06N3/08G06Q10/04
Inventor 岳捷张吉包大恩姜源
Owner ZHONGNENG POWER TECH DEV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products