A distribution network and load technology, applied in the direction of electrical components, circuit devices, information technology support systems, etc., can solve problems such as distribution network load changes, failure to deal with circuit failures in time, and affect users' daily life, so as to achieve the effect of improving work efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Embodiment 1: as attached figure 1 As shown, the distribution network load abnormality warning method includes the following steps:
[0031] The first step is to extract the load data of each distribution network line in the main network database according to the OPEN3000 main network control system;
[0032] The second step is to compile the distribution network load abnormality judgment module on the basis of OPEN3000 main network control system, and carry out real-time monitoring and data comparison on the distribution network line load;
[0033] The third step is to calculate t 1 and t 2 The load P of the monitored distribution network line at all times (t 1 ) and P(t 2 ), the calculation formula of distribution line load change rate§ is as follows:
[0034] §=[P(t 2 ) / P(t 1 )-1]×100%
[0035] where P(t 1 ) is the load value of a distribution network line at a certain moment, P(t 2 ) is the load value of a distribution network line after ᇫt time;
[0036]...
Embodiment 2
[0052] Embodiment 2: as figure 1 As shown, to determine whether there is a load change in the 110 kV western suburbs substation to 10 kV Xinhua West line: within a certain period of time, the load of the Xinhua West line has dropped from 3.7 MW to 2.6 MW at the initial moment, and the calculation formula is:
[0053] §=[(2.6 / 3.7)-1]*100%=-29.73%,
[0054]Because §<-20%, it is determined that there is a load change on the line at this time, and there may be a fault on the line, which requires real-time attention and processing by relevant operation and maintenance personnel. The normal change rate K of the line load is the limit value, generally 20%. The limit value K=20% is an empirical value (normal line load fluctuation is very small), that is, the sudden drop of the general distribution network line load by more than 20% is considered to be a load change, and the line is faulty.
[0055] In actual work, the load of a distribution network line at a certain initial moment i...