Asphalt loading metering and adjusting device and metering and adjusting method
A technology of adjusting device and adjusting method, which is applied in the direction of distribution device, special distribution device, liquid distribution, transportation or transfer device, etc. It can solve the problems of slow response time of flow control, large equipment footprint, detection and adjustment, etc., to achieve Conducive to maintenance and repair, small footprint and stable operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] Example 1, such as figure 1 As shown, a kind of asphalt loading metering adjustment device described in the first embodiment of the present invention includes:
[0045] A process pipeline 2, one end of which is connected to the first flange 1;
[0046] Flow regulating pipeline 4, one end of which is connected to the other end of process pipeline 2 through first process gate valve 3, and integrated temperature transmitter 5, flow regulating valve 6 and second process gate valve 7 are sequentially connected in series on flow regulating pipeline 4, integrated The temperature transmitter 5 is connected to the process controller 16 through the second instrument cable 26, and the flow regulating valve 6 is connected to the process controller 16 through the third instrument cable 27;
[0047]The return line 12 is arranged on the flow regulating line 4, one end of the return line 12 is connected to the flow regulating line 4 between the first process gate valve 3 and the integ...
Embodiment 2
[0057] Embodiment 2, the metering and adjusting method of a kind of asphalt loading metering and adjusting device described in the second embodiment of the present invention, such as figure 2 As shown, the method includes the following steps:
[0058] Step 1, open the loading start-stop button 17 provided outside the process controller 16, and start the loading signal to connect to the process controller 16 through the sixth instrument cable 19;
[0059] Step 2, asphalt enters the process pipeline 2 through the inlet of the process pipeline 2, and enters the flow regulating pipeline 4 through the first process valve 3 imported upstream;