[0017] Example: Installation of physical isolation facilities within the remediation range of a certain section of the high-speed railway undertaken by the applicant. Physical isolation is set between the two lines, 2.7m away from the center of the operating line and 2.3m away from the center of the maintenance line. The two ends of the isolation are set close to the tunnel entrance and the bridge head. The horizontal isolation enclosure is mainly used to isolate the roadbed maintenance and the traffic. interference.
[0018] The physical isolation between the lines is above 2.6m above the top surface of the closed layer, using a combination of color steel plate and steel wire mesh. The uprights are made of H-shaped steel uprights (100×100×6×8) with a distance of 2m. The size of the foundation is 80cm×80cm×90cm. After the foundation excavation is completed, the C30 concrete is put into the reinforcement cage, and M20 U-shaped anchor bolts and 8mm thick 30×30cm connecting steel p...