Highway tunnel traffic accident risk evaluation method based on fuzzy analytic hierarchy process

A fuzzy hierarchical analysis and expressway technology, applied in the field of tunnel risk assessment, can solve problems such as fuzziness and simplification of things, and achieve the effect of reasonable evaluation and objective evaluation results

Inactive Publication Date: 2017-07-04
SOUTHWEST JIAOTONG UNIV
View PDF0 Cites 39 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The advantage of the quantitative analysis method is that it can use intuitive data to objectively express the

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Highway tunnel traffic accident risk evaluation method based on fuzzy analytic hierarchy process
  • Highway tunnel traffic accident risk evaluation method based on fuzzy analytic hierarchy process
  • Highway tunnel traffic accident risk evaluation method based on fuzzy analytic hierarchy process

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] The present invention is specifically described by the following examples. This example is only used to further illustrate the present invention, and cannot be interpreted as limiting the protection scope of the present invention. Those skilled in the art make some non-essentials according to the content of the present invention above. Improvements and adjustments also belong to the protection scope of the present invention.

[0042] figure 1 It is a schematic diagram of the division of highway tunnel research sections, including: tunnel entrance impact section, tunnel exit influence section, and tunnel middle section.

[0043] figure 2 It is an implementation flowchart of the risk assessment method based on fuzzy hierarchical analysis in the present invention, including:

[0044] Step 1. Through the investigation and analysis of the causes of traffic accidents and expert recommendations, multiple evaluation indicators are obtained to generate an evaluation index dom...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a highway tunnel traffic accident risk evaluation method based on fuzzy analytic hierarchy process. The method includes the following steps: formulating a plurality of evaluation indices to obtain an evaluation index domain, dividing a highway tunnel into three research sections, establishing respective index system for each research section; formulating a plurality of evaluation levels to obtain an evaluation level domain; separately computing the fuzzy degree of membership of respective evaluation index to respective evaluation level, constructing a degree of membership matrix; computing a weight vector of the evaluation indices; on the basis of the weight vector and the degree of membership matrix, synthesizing a comprehensive evaluation vector; computing a risk value, on the basis of the risk value, determining risk conditions. According to the invention, by using the fuzzy matrix and the application of the analytic hierarchy process to risk evaluation, the method can analyze respective uncertain factor and index that appear in the course of risk evaluation; by setting a first level index and a second level index, the method can consider from a multiple aspects and can deliver more comprehensive analysis by dividing the tunnel into three regions and make related talks, the method herein takes the minimum evaluation value as a final evaluation result. The evaluation is more much reasonable.

Description

technical field [0001] The invention relates to the technical field of tunnel risk assessment, in particular to a risk assessment method for expressway tunnel traffic accidents based on fuzzy hierarchy analysis. Background technique [0002] The construction of expressway tunnels in my country started relatively late, but has developed rapidly, especially in the construction of expressways in mountainous areas, and a large number of road tunnels have appeared. From the end of the last century to the present, the number of domestic road tunnels has increased sharply, and the scale is relatively long. Both of them are in the forefront of the world. , and is at an important stage of development. However, when a large number of highway tunnels were put into operation, the safety problem of tunnel operation became more and more serious. Therefore, according to the engineering characteristics of expressway tunnels, it is a work of great practical significance to conduct tunnel ope...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/26
CPCG06Q10/0635G06Q50/26
Inventor 王明年李玉文刘大刚林国进朱长安袁家伟王联郑金龙高世军周仁强
Owner SOUTHWEST JIAOTONG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products