Dotting method for road and bridge construction of municipal construction
A road bridge and municipal technology, applied in the field of road and bridge construction management for municipal construction, can solve the problems of not being able to adapt to the construction environment, and not being able to accurately adjust the distance between dots
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0069] The present invention will be described in further detail below in conjunction with the accompanying drawings.
[0070] A road and bridge construction dotting method for municipal construction, using an adjustable point spacing type dotting device, the adjustable dot spacing type dotting device includes a housing 1, walking wheels 2, driving wheels 3, drive rollers 4, from Moving wheel 5, dotting device 6;
[0071] The housing 1 is hollow and rectangular, the right side wall of the housing 1 is detachably connected by fixing bolts 11, the lower end surface of the housing 1 is provided with a walking hole 12, and the lower end surface of the housing 1 is located in the walking hole 12 The right side is provided with punching hole 13;
[0072] Described walking wheel 2 comprises:
[0073] The walking wheel shaft 21 is arranged on the inner side of the right side wall of the housing 1 along the left-right direction;
[0074] The travel wheel body 22 is rotatably sleeved...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com