Embodiment 1
[0020] Combine below figure 1 The structural composition of the horizontal force transmission guarantee system of the pile row wall support structure of the present invention is described in detail.
[0021] Such as figure 1 As shown, the horizontal force transmission guarantee system of the pile wall support structure of the present invention includes: concrete pile wall 1, embedded parts 2, section steel force transmission structure 3, steel purlin 4, and steel bar skeleton 5. Among them, the embedded part 2 is pre-fixed at the design position of the steel bar frame 5, and is placed together with the steel bar frame 5 to the design position of the concrete pile row wall 1, and the concrete pouring of the concrete row pile wall 1 is carried out after the sinking is completed; if the concrete If the centers of the piles in the pile row wall 1 are not on the same horizontal line, when the foundation pit is excavated to the position of the embedded part 2, the concrete on the s...
Embodiment 2
[0023] Please continue to refer figure 1 , the present invention also provides a design method for the horizontal force transmission guarantee system of the pile row wall support structure. The method comprises the steps of:
[0024] Step 1: Fix the embedded part 2 to the designed position of the steel skeleton 5 of the concrete pile wall 1 through anchoring steel bars in advance.
[0025] Step 2: sinking the embedded part 2 and the steel skeleton 5 to the designed position in the concrete pile wall 1 .
[0026] Step 3: Carry out pouring of the concrete row pile wall 1 .
[0027] Step 4: If the centers of the piles in the concrete pile row wall 1 are not on the same horizontal line, after the foundation pit is excavated to the position of the embedded part 2 on the steel skeleton 5 of the concrete pile row wall, the concrete on the surface of the concrete pile row wall 1 is removed, Embedded part 2 is exposed.
[0028] Step 5: Connect the steel purlin 4 with the embedded p...