A construction method and technology for constructing columns, which are applied to manufacturing tools, columns, piers, etc., can solve the problems of inability to guarantee the quality of concrete pouring, difficulty in concrete vibrating, and complicated construction procedures, so as to shorten the construction period, reduce weight, and reduce The effect of construction difficulty
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The present invention will be further described in detail below in conjunction with the accompanying drawings.
[0030] like figure 1 and figure 2 As shown, the construction method of the prefabricated construction column in this embodiment comprises the following steps:
[0031] (1) Obtain the prefabricated structural column formwork. The length of the prefabricated structural column formwork is less than the distance between the floor and the upper beam at the construction position. The left and right sides of the prefabricated structural column formwork are horse teeth. The prefabricated structural column A through hole extending along the left and right direction is provided at each position where two adjacent concavo-convex parts border each other on the side of the formwork, and the top surface of the prefabricated structural column formwork is provided with a The concrete pouring cavity on the bottom surface of the shell is located at the top of the front side...