Embodiment 1
[0038] Embodiment 1: a kind of rainwater pipe embedding structure, such as figure 1 As shown, the revetment 1 is included, and the side of the revetment 1 facing the water is provided with two circles of cofferdams 4 . Such as figure 2 As shown, two circles of cofferdams 4 are arranged concentrically, and each circle of cofferdams 4 includes a concrete body 5, and steel pipes 6 are arranged on the side of the concrete body 5 to increase the strength.
[0039] Such as figure 1 As shown, the revetment 1 includes a wall 1-1 arranged perpendicular to the ground, and a front toe 1-2 is set on the side of the wall 1-1 facing the water, and the front toe 1-2 is connected to the cofferdam 4 through a concrete foundation 7 . The concrete foundation 7 is connected to the ground through an earthwork group 8 . The ground is inclined, and the height gradually decreases from wall 1-1 to cofferdam 4. The first excavation groove 9 that is concave on the inclined ground is dug on the gro...
Embodiment 2
[0044] Embodiment 2: a kind of rainwater pipe embedding method, comprises the steps:
[0045] First, the prefabricated square pile 3 is driven into the side of the body of wall 1-1 facing the water area, and the side of the body of wall 1-1 facing the water area is set as an inclined plane. The inclined structure of the inclined plane is: the top of the body of wall 1-1 faces the water area The projection of one end in the vertical direction falls on the cross-sectional area of the bottom of the wall body 1-1. The side facing the waters at the bottom of the body of wall 1-1 is the front toe 1-2, and the prefabricated square pile 3 is vertically driven into the ground on the side of the front toe 1-2 facing the waters, the overall length of the prefabricated square pile 3 It is 7m, the elevation of the end driven into the ground is -4.40m, and the elevation of the end exposed to the ground is 2.293m.
[0046] Among the prefabricated square piles 3, the prefabricated square p...