Cast-in-situ construction method of 2209 beam flange plate
A flange plate and cast-in-place technology, which is applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of complex structure, limited scope of application, and difficult assembly of forming machines, and achieve low cost, simple materials, and convenience The effect of the operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The invention discloses a cast-in-place construction method for 2209 beam flange plates, which has the following characteristics:
[0028] 1. Construction period
[0029] With one set of formwork as a working surface, each span of 2209 beam sound barrier cast-in-place is a working cycle, and personnel are reasonably arranged to support formwork, steel bar binding, pouring concrete, concrete curing, and formwork removal. It takes 7 days to pour a span of 2209 beams using a set of arrangement suspension tooling.
[0030] 2. Quality
[0031] The arrangement and suspension method is adopted, the construction structure is stable and reliable, the working platform is easy to operate, the concrete vibration and maintenance meet the requirements, and can meet the construction acceptance standards.
[0032] 3. Environmental protection
[0033] The steel bar waste produced by this construction method is uniformly recycled; the concrete construction uses a bucket, and the remai...