A Method for Calculating Heavy Oil Well Production Based on Surface Dynamometer Diagram
A dynamometer, oil well technology, applied in calculation, measurement, earthwork drilling and other directions, can solve the problem of continuous and accurate measurement of single well production, and achieve the effect of simplifying the surface measurement process, simplifying the calculation program, and saving money
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0073]Heavy oil well GD in a block of Shengli Oilfield23, The degassed crude oil viscosity is 30562mPa.s, the pump diameter is 58mm, the stroke is 4.23m, the stroke is 2.78 times / min, the tested maximum load is 24.09kN, the minimum load is 14.08kN, and the well water cut is 34.5%. See the actual ground indicator diagram at 07:12 on May 6, 2017figure 2 , The indicator diagram data is shown in Table 1. The production of the oil well is calculated using the method of the present invention. Specific steps are as follows:
[0074]Table 1 Heavy oil well GD23Indicator diagram data
[0075]
[0076]
[0077]
[0078](1) Determine the load reference value L
[0079]L=(Lmax -Lmin ) / m+Lmin =(24.09-14.08) / 3+14.08=17.42kN
[0080]Among them, L-load reference value, kN;
[0081]Lmax -Maximum load, 24.09kN;
[0082]Lmin -Minimum load, 14.08kN;
[0083]m-reference coefficient, rounded, m=3.
[0084](2) According to the load reference value L, from n indicator diagram point pairs, where n=200, construct the indicator diagram point ...
Embodiment 2
[0122]Heavy oil well GD in a block of Shengli Oilfield12, Degassed crude oil viscosity 27600mPa.s, oil well pump diameter is 58mm, stroke is 4.19m, stroke is 2.72 times / min, tested maximum load is 26.46kN, minimum load is 8.95kN, oil well water cut is 65.0%. See the measured ground indicator diagram at 08:05 on July 8, 2017Figure 4 , The indicator diagram data is shown in Table 3. The production of the oil well is calculated using the method of the present invention. Specific steps are as follows:
[0123]Table 3 Heavy oil well GD12Indicator diagram data
[0124]
[0125]
[0126](1) Determine the load reference value L
[0127]L=(Lmax -Lmin ) / m+Lmin =(26.46-8.95) / 3+8.95=14.79kN
[0128]Among them, L-load reference value, kN;
[0129]Lmax -Maximum load, 26.46kN;
[0130]Lmin -Minimum load, 8.95kN;
[0131]m-reference coefficient, rounded, m=3.
[0132](2) According to the load reference value L, from n indicator diagram point pairs, where n=200, construct the indicator diagram point pair number set P that meets ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com