Group-controlled elevator device and method for allocating boarding numbers of group-controlled elevators
A technology of number machine and group control, applied in elevators, transportation and packaging, etc., can solve the problems of users' dissatisfaction with elevators, increase the distrust and anxiety of elevators, and different quality, and achieve the effect of suppressing long-term waiting.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] figure 1 It is a block diagram showing a main part of a group control elevator apparatus according to an embodiment of the present invention. The group control elevator device includes: boarding cars 1A~1N of multiple elevators; boarding car control units 2A~2N respectively controlling the boarding cars 1A~1N; building arrival detection units arranged far away from the elevator hall 3A-3N; the elevator hall arrival detection unit 4 and the notification unit 5 arranged in the elevator hall; the user management unit 6, the user management unit 6 is connected with the building arrival detection units 3A-3N, the elevator hall arrival detection unit 4 and the notification unit 5 are connected to each other to manage information about users; and a group control unit 7, which acquires various information from the user management unit 6 and boarding car control units 2A-2N, and controls each boarding The number machines 1A~1N perform group control. Here, the user management u...
Embodiment 2
[0090] Next, Embodiment 2 of the present invention will be described, but this embodiment is different from Embodiment 1 in that the Figure 5 Step 8 is shown with a change. Since the other control steps are the same, description thereof will be omitted. Image 6 It is a flowchart showing boarding car change processing of the group control elevator apparatus according to the second embodiment.
[0091] In the previous embodiment, in step S8 , the one-week time of the boarding car after the temporary change was calculated, and the change was decided from the boarding car whose increase in the one-week time was smaller.
[0092] In contrast, in the present embodiment, in step S13, which replaces step S8, the temporarily changed estimated operating routes of each boarding car are generated and the one-week time is calculated respectively, and the one-week time of all boarding cars is calculated at the most. The averaged boarding numbers are determined as changing boarding numbe...
Embodiment 3
[0095] Next, Embodiment 3 of the present invention will be described, but this embodiment is also different from Embodiment 1 in that the Figure 5 Step 8 is shown with a change. Since the other control steps are the same, description thereof will be omitted. Figure 7 It is a flowchart showing boarding car change processing in the group control elevator apparatus according to the third embodiment.
[0096] In the previous embodiment, in step S8 , the one-week time of the boarding car after the temporary change was calculated, and the change was decided from the boarding car whose increase in the one-week time was smaller.
[0097] On the other hand, in this embodiment, in step S14 instead of step S8, the estimated operation route of each boarding car after the temporary change is generated, and the averaged boarding intervals to the lobby floor are obtained from the estimated operation route information. The flight is determined as a change boarding flight.
[0098] Accordin...