Three-phase four-wire electric energy meter capable of detecting its own faults
A three-phase, four-wire, self-fault technology, applied in the field of electric energy meters, can solve the problems of small switching current, three-phase, four-wire electric energy meter without phase line switching, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0089] Embodiment: the three-phase four-wire watt-hour meter that can detect self-fault, see figure 1 , Figure 5 As shown, it includes a three-phase four-wire electric energy meter body, and the three-phase four-wire electric energy meter body includes A phase, B phase, C phase, neutral line N and a three-phase electric energy metering module 110 . It also includes a node J1, a filter 104, a controller 107, and a three-phase balance monitor 101 respectively connected to the controller, a No. 1 voltage sampling circuit 102, a single-phase inverter power supply 103, an isolation transformer 105, a memory 106, and No. 2 voltage Sampling circuit 108 and interface power monitor 109 . The filter is respectively connected to the power output end of the single-phase inverter power supply and the power input end of the isolation transformer, the node J1 is respectively connected to the power output end of the isolation transformer and the sampling end of the second voltage sampling c...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


