Double-shield TBM shield body jamming prediction method and system
A technology of shield jamming and prediction method, which is applied in earth-moving drilling, mining equipment, tunnels, etc., can solve the problems of time, material cost loss, equipment shutdown, and less research on jamming early warning, so as to avoid jamming. The effects of a machine accident
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0035] Such as figure 1 As shown, a double-shield TBM shield jamming prediction method, the steps are as follows:
[0036] Step 1: Obtain the tunneling parameters in real time through the on-site TBM host computer. The tunneling parameters include single-pole thrust and advancing speed.
[0037] Step 2: Select the first n tunneling parameters at the current moment, single-pole thrust F 1 , F 2 ,...,F n , propulsion speed V 1 , V 2 ,...,V n , where F n ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com