Rapid construction device for two-phase stainless steel tanker corrugated bulkhead
A duplex stainless steel and construction device technology, applied in ship parts, ship design, ship construction, etc., can solve the problems of occupation of slipway crane hooks, long time for scaffolding, slow segment positioning, etc., to save slipway resources and shorten occupation. The effect of the time of the hoist
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0035] Such as Figure 1-4 As shown, a dual-phase stainless steel tank bulkhead rapid construction device, including the main frame 16;
[0036] The main body frame 16 includes five support units 1, and the five support units 1 are stacked sequentially from top to bottom;
[0037] Two hooks 2 are arranged on the uppermost bracket unit 1 in the main frame 16;
[0038] The openings of the two hooks 2 face downward, and the two hooks 2 are used to hook the corrugated bulkhead 15 at the same time.
[0039] After the trough bulkhead 15 of the berth cargo hold area is mounted and positioned in sections, the present invention is lifted vertically with a truck crane, and two hooks 2 of the present invention are used to hook the trough bulkhead 15 to complete the erection, that is, the present invention effectively shortens the The trough-shaped bulkhead 15 takes up the time of the crane during the segmental loading, saves the scaffolding and dismantling work, and saves the resources...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


