A method of installing billboards with hot air balloons
An installation method and hot air balloon technology, applied in the field of billboards, can solve problems such as hot air balloon shaking, potential safety hazards, billboard shaking, etc., and achieve the effect of reducing the shaking range, obvious effect, and reduced range
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] A billboard with a hot air balloon, comprising a hot air balloon 1 and an advertising board 2, the hot air balloon 1 has two, and an advertising frame 2 is connected between the two hot air balloons 1, and the advertising frame 2 includes two upper and lower The first shelf 3 and the second shelf 4 are arranged, the first shelf 3 includes two first side panels 15, the two first side panels 15 are rotatably connected, and the connecting position of the two first side panels 15 Aligned first sockets 16 are respectively arranged on the top, and first bolts 17 for fixing are inserted in the first sockets 16. The outer end of the first side plate 15 is provided with a circular base 10, and the circular base 10 is fixedly connected with a hot air balloon 1, the bottoms of the two circular bases 10 are respectively provided with cables 7, and the cables 7 are connected to the ground, and the two circular bases 10 are respectively provided with Curved side plates 11, a second c...
Embodiment 2
[0029] The bottoms of the outer ends of the two first side plates 15 are respectively provided with a limiting block 12, the limiting block 12 is provided with a downwardly opening limiting groove 13, and the outer end of the second side plate 18 is provided at a position corresponding to the limiting groove 13. The block 14 protruding upwards, when the first shelf 3 and the second shelf 4 are at the same linear position, the block 14 is snapped into the limiting groove 13 .
[0030] A method for installing billboards with hot air balloons, the specific steps are as follows:
[0031] S1, respectively adjust the included angle formed by the two rotatably connected first side plates 15 and the two rotatably connected second side plates 18 to correspond to the size of the billboard 6 to be clamped, and through the first latch 17 and The second latch 20 fixes the included angle, and passes through the rotating connecting ends of the two first side plates 15 and the rotating connec...