A method for replacing columns without dismantling joists in a factory building
A technique of joist replacement and factory buildings, which is applied in construction, building maintenance, building construction, etc., can solve the problems of long construction period and high cost, and achieve the effects of low cost, huge economic benefits, and simple methods
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0009] The present invention comprises the following steps: 1), measure the span of the new column required by the factory building, calculate the required strength, draw the part diagram of the new joist and the new column, and make the new joist and the new column; 2), the method of passing on the piston of a plurality of jacks 7 Temporary uprights 5 are fixed respectively, and each jack 7 is respectively fixed at the corbel 8 of the crane beam 8 on the same side of the workshop, and each temporary upright 5 is supported on the original joist 3 on the same side; The original joist 3 and the roof truss 1 on the same side are jacked up, and the new joist is placed at the position of the original joist 3 with a crane, and the new columns are fixed at both ends of the new joist; 1. Fall on the new joists and fix them; 5) Remove the jacks 7, the temporary columns 5, the original middle column 4 between the original joists 3 and the new column.
[0010] The jacks 7 are electric ja...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 