Medium and long-term load curve generation method for satisfying electricity quantity constraint

A load curve, medium and long-term technology, applied in the field of medium and long-term load curve generation, can solve problems such as large forecast error, failure to fully consider the correlation between load and electricity, and inability to fully describe the characteristics of medium and long-term forecast load curves, achieving significant advantages , to overcome the effect of large prediction error

Active Publication Date: 2018-11-06
XI AN JIAOTONG UNIV
View PDF4 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In summary, the forecast generation of medium and long-term load curves is a key issue in the field of power system planning, and plays a fundamental role i

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Medium and long-term load curve generation method for satisfying electricity quantity constraint
  • Medium and long-term load curve generation method for satisfying electricity quantity constraint
  • Medium and long-term load curve generation method for satisfying electricity quantity constraint

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0044] The present invention will be described in detail below in conjunction with the drawings.

[0045] See figure 1 , The present invention first reads the annual maximum load, annual total power, winter and summer typical daily load curves, monthly load characteristics, and historical 8760-hour load data into the program, and sorts the historical 8760-hour load data monthly; secondly, it sorts the obtained monthly load data The last historical 8760-hour load data is the original data, and the predicted annual maximum daily load is calculated, which is used as the data basis for the predicted load, and then the predicted annual load curve is obtained according to the principle of electricity conservation; finally according to the obtained time series load curve , Calculate and form an accurate continuous load curve and segmented continuous load curve with a period of 168 hours.

[0046] Specifically include the following steps, the flow chart such as figure 1 Shown.

[0047] St...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

A medium and long-term load curve generation method for satisfying an electricity quantity constraint comprises the steps of reading an annual maximum load, an annual total electricity quantity, typical daily load curves in summer and winter, monthly load characteristics and 8,760 hours of historical load data into a program, and organizing the 8,760 hours of historical load data by the month; calculating a daily maximum load in a prediction year with the obtained 8,760 hours of historical load data organized by the month as original data, and then obtaining a time-sequence load curve of the prediction year according to a conservation of charge as a principle; and finally, calculating to form an accurate continuous load curve and a sectional continuous load curve on a 168-hour cycle. According to the medium and long-term load curve generation method for satisfying the electricity quantity constraint, typical daily load curve characteristics and monthly load characteristics are fully considered in the switching of the time sequence load curve and the continuous load curve, shape characteristics of the load curves are guaranteed to satisfy the requirement on the premise of the electricity quantity constraint; and the load tendency and the change characteristics can be described and depicted more comprehensively, and a foundation is laid for establishment of an optimized planningmodel of an electric power system.

Description

technical field [0001] The invention belongs to the field of electric power system planning, and relates to a method for generating medium and long-term load curves satisfying power constraints. Background technique [0002] As the foundation of power generation planning, load forecasting is the most important thing for the safe and stable operation of the power system. Medium and long-term load forecasting refers to monthly, seasonal and annual load curve forecasting, which is the basis for power planning, design and investment in power systems. The annual load curve was first compiled by a group of monthly maximum loads in December of the year, but at present the power sector requires the annual load curve to be compiled with daily maximum loads or even hourly loads. The forecast mainly includes electricity consumption, maximum load, load Characteristic indicators, typical daily time series, continuous load curve prediction, etc. [0003] Compared with the short-term dai...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/04G06Q50/06
CPCG06Q10/04G06Q50/06
Inventor 邵成成王雅楠冯陈佳
Owner XI AN JIAOTONG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products