Construction method of advanced cast-in-place cover beam
A construction method and cast-in-place technology, applied in chemical instruments and methods, clay preparation equipment, cement mixing equipment, etc., can solve problems such as time-consuming, construction delays, and low concrete efficiency
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2018-11-23
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2
Abstract
Description
technical field
[0001] The invention relates to the construction field, in particular to a high-grade cast-in-place cap beam construction method. Background technique
[0002] With the development of science and technology and the progress of society, the country has been promoting the development of high technology. A large amount of concrete needs to be used in the construction process of cast-in-place cap beams. The existing concrete preparation equipment is not efficient and takes a lot of time, which may lead to Construction was delayed, so a new type of equipment was urgently needed. Contents of the invention
[0003] The purpose of the present invention is to provide a high-grade cast-in-place cap beam construction method, which can overcome the above-mentioned defects of the prior art.
[0004] According to the present invention, an advanced cast-in-place cap beam construction method of the equipment of the present invention uses a construction equipment, the cons...
Examples
Embodiment Construction
[0015] All features disclosed in this specification, or steps in all methods or processes disclosed, may be combined in any manner, except for mutually exclusive features and / or steps.
[0016] Any feature disclosed in this specification (including any appended claims, abstract and drawings), unless expressly stated otherwise, may be replaced by alternative features which are equivalent or serve a similar purpose. That is, unless expressly stated otherwise, each feature is one example only of a series of equivalent or similar features.
[0017] like Figure 1-2As shown, an advanced cast-in-place cap beam construction method of the present invention uses a construction equipment, the construction equipment includes a box body 100, a first transmission chamber 101 is arranged inside the box body 100, and the first transmission chamber 101 The upper end wall of the transmission chamber 101 is fixed with a first motor 102, and the lower end of the output shaft of the first motor ...