Intelligent stretching trolley
A technology of intelligent tensioning and trolley, which is applied in the field of machinery, can solve the problems of high responsibility, insecurity, and low efficiency, and achieve the effects of improved control accuracy, good safety, and convenient operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] An intelligent tensioning trolley includes a truss unit, a walking unit, a lifting unit and a control unit, the bottom of the truss unit is connected to the walking unit, the top of the truss unit is connected to the lifting unit, and the control unit is connected to the lifting unit.
Embodiment 2
[0029] An intelligent tensioning trolley includes a truss unit, a walking unit, a lifting unit and a control unit, the bottom of the truss unit is connected to the walking unit, the top of the truss unit is connected to the lifting unit, and the control unit is connected to the lifting unit.
[0030] The walking unit moves the intelligent tensioning trolley above the negative bending moment to be stretched, installs the jack on the lifting unit and connects it to the control unit, and the control unit controls the lifting unit to move the jack down to the tensioning place of the negative bending moment and install it in place , to carry out symmetrical intelligent overall tensioning at both ends; using intelligent tensioning, the jack is placed in place by the intelligent tensioning trolley, saving time and effort, convenient operation, high efficiency, and good safety; intelligent tensioning can accurately monitor and control stress and elongation Quantity, timely check elonga...
Embodiment 3
[0032] Such as Figure 1-3 As shown, an intelligent tensioning trolley for T-beam negative moment mid-beam includes a truss unit, a walking unit, a lifting unit and a control unit. The bottom of the truss unit is connected to the walking unit, the top of the truss unit is connected to the lifting unit, and the control unit is connected to lift unit.
[0033] The truss unit includes an upper frame body 1, a lower frame body 2, a middle frame body 11 and a plurality of vertical beams 3, and the upper layer frame body 1, the middle layer frame body 11 and the lower layer frame body 2 are sequentially connected by a plurality of vertical beams 3 from top to bottom , the middle frame body 11 and the lower frame body 2 all include left vertical beam 4, right vertical beam 5 and a plurality of cross beams 6, the left vertical beam 4 is horizontally symmetrically connected to the right vertical beam 5 through a plurality of cross beams 6, and the upper layer frame body 1 is a Crossbe...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


