Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Underground diaphragm wall construction method suitable for pebble and boulder stratums with non-uniform hardness

A kind of underground diaphragm wall, uneven soft and hard technology, applied in sheet pile wall, foundation structure engineering, construction and other directions, can solve the problem of serious intrusion limit of underground diaphragm wall, failure to meet the requirements of construction period, accuracy can not be guaranteed and other problems , to achieve the effect of reducing construction cost, improving construction speed and reducing difficulty

Pending Publication Date: 2018-12-07
BEIJING MUNICIPAL CONSTR
View PDF3 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This kind of construction method is often not efficient, and the problem of delaying the construction period has not been solved. While increasing the construction cost, the problem of the invasion of the underground diaphragm wall is also very serious.
[0003] With the development of the times, the number of foundation pit projects is increasing. The traditional underground diaphragm wall trenching method often fails to meet the construction period requirements when dealing with soft and hard uneven pebbles and boulders, and the accuracy cannot be guaranteed.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Underground diaphragm wall construction method suitable for pebble and boulder stratums with non-uniform hardness
  • Underground diaphragm wall construction method suitable for pebble and boulder stratums with non-uniform hardness

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] The technical solutions of the present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0028] see Figure 1-2 The invention relates to a construction method for an underground diaphragm wall suitable for soft and hard uneven boulder boulder formations, including 2 forming grooves in soft pebble boulder formations, drilling vertical boreholes 1, and 3 grasping soil formation in hard pebble boulder formations. The trough and underground diaphragm wall are constructed in 6 steps in four steps.

[0029] After the soft pebble boulder formation 2 is hollowed out, the grooving machine is directly used for trough forming operation, and a plurality of extended vertical boreholes 1 are drilled at the trough forming position, and the vertical boreholes 1 are drilled along the relatively hard pebble boulder. The entire depth of the diaphragm wall foundation groove 5 in the formation 3 extends.

[0030] In this em...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an underground diaphragm wall construction method suitable for pebble and boulder stratums with non-uniform hardness. The method includes the four steps of grooving of the softpebble and boulder stratum, drilling of vertical drill holes, soil grasping grooving of the hard pebble and boulder stratum and underground diaphragm wall construction. After the soft pebble and boulder stratum is excavated, grooving work is carried out directly through a grooving machine, the multiple stretching vertical drill holes are drilled in a grooving position, and the vertical drill holes stretch along the whole depth of an underground diaphragm wall foundation trench in the hard pebble and boulder stratum. The vertical drill holes are formed in the position of a grab bucket of the grooving machine, the grab bucket can more easily enter the hard pebble and boulder stratum along the vertical drill holes, the grooving speed of an underground diaphragm wall is increased, abrasion ofthe grooving machine is reduced, and the construction cost of the underground diaphragm wall in the specific stratums is reduced; and meanwhile, the grooving machine can be guided to carry out the grooving work through the vertical drill holes, and clearance intrusion of the underground diaphragm wall is reduced.

Description

technical field [0001] The invention relates to the field of underground diaphragm wall construction, more specifically, it relates to an underground diaphragm wall construction method suitable for soft and hard uneven pebble boulder formations. Background technique [0002] When excavating the foundation pits of urban rail transit subway stations and building houses, they generally belong to the "soft top and hard bottom" stratum. Due to the high strength of the hard rock in the stratum, it is difficult to form a groove in the underground diaphragm wall. It is difficult for the hydraulic grab of the traditional groove forming machine to directly For grooving, an impact drill is required to cooperate with a grooving machine for grooving. This construction method is often inefficient, and the problem of delaying the construction period has not been solved. While increasing the construction cost, the problem of the invasion of the underground diaphragm wall is also very seriou...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/18
CPCE02D5/187
Inventor 孟庆龙姜美杰蔡锐曹跃田凯高健姚艳峰赵红然常国栋邢健杨东宝张秋芳
Owner BEIJING MUNICIPAL CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products