Pipe joint, disassembly and assembly tool and air conditioner
A technology for pipe joints and tools, which is applied in the direction of pipes/pipe joints/fittings, manufacturing tools, sealing surface connections, etc. It can solve problems such as inconsistent specifications, hard nuts, and easily damaged nuts, so as to reduce the risk of accidents and avoid Effect of Nut Deformation Failure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] The invention provides a pipe joint, a disassembly tool and an air conditioner. Such as figure 1 As shown, the pipe joint of the present invention includes a single joint 1 and a nut 2, and the single joint 1 and the nut 2 are tightly fitted with each other. combine figure 2 and image 3 As shown, the single joint 1 includes a head 11 and a screw 12, the screw 12 is provided with an external thread 121, and the head 11 and the screw 12 are integrally formed in structure. The nut 2 includes a clamping portion 21, a slope portion 22 and a hollow portion 23, wherein the clamping portion 21 is cylindrical, the slope portion 22 is a truncated cone, and the slope 22 is a circular table with a large diameter. Connected with the circular surface of the clamping part 21, the clamping part 21 and the slope part 22 are integral in structure; the hollow part 23 is a hole-like structure, located in the middle hollow part of the nut 2, and the hollow part 23 Through the nut 2 in...
Embodiment 2
[0043] On the basis of Embodiment 1, this embodiment provides a dismounting tool 5 that is used in conjunction with the nut 2 described in Embodiment 1 above. combine Figure 6 As shown, the assembly and disassembly tool 5 of the present invention includes a buckling portion 51 and a handle 52 . The fastening part 51 includes a separation structure 511 and a locking protrusion 512. The separation structure 511 is arranged in the middle of the inner ring surface of the fastening part 51 of the dismounting tool 5. The separation structure 511 is an arc-shaped structure, and the locking protrusion 512 It is arranged on the inner ring surface of the fastening part 51; there are two fastening parts 51, and the two fastening parts 51 are respectively arranged at the two ends of the handle 52, and the fastening part 51 and the handle 52 are structurally integrally formed. The partition structure 511 is in the middle of the inner ring surface of the fastening part 51, and the partiti...
Embodiment 3
[0047] On the basis of Embodiment 1 and Embodiment 2, Embodiment 3 provides an air conditioner, combining Figure 9 As shown, the air conditioner includes an indoor unit connecting pipe 3 and an outdoor unit connecting pipe 4, and the indoor unit connecting pipe 3 and the outdoor unit connecting pipe 4 are connected through the pipe joint in the first embodiment. The single joint 1 of the pipe joint is connected with the connecting pipe 3 of the indoor unit, and the nut 2 is connected with the connecting pipe 4 of the outdoor unit. Commonly used air conditioners are divided into indoor units and outdoor units. When installing an air conditioner, the operator needs to connect the indoor unit to the outdoor unit through a connecting pipe, so as to realize the heat exchange between indoor and outdoor refrigerants, so as to achieve cooling or heating effects. Existing indoor units are generally provided with a single joint flowing out from the evaporator end when leaving the facto...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com