A high-speed railway hanging string pre-fitting method to compensate for the impact of contact wire wear
A high-speed railway and contact wire technology, applied in the direction of overhead lines, etc., can solve problems such as harsh service conditions, and achieve the effect of long service life and good performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] Below by embodiment, in conjunction with accompanying drawing, the technical scheme of the present invention is described further specifically, as Figure 1-2 As shown, each line on the figure represents the position of the contact line under different wear coefficients, the horizontal axis is the distance along the line, and the vertical axis is the height of the contact line. The allowable deviation of contact line height within a single anchor segment is ±30mm, the allowable range of contact line height difference between adjacent anchor points is 20mm, and the allowable range of contact line height difference between adjacent hanging strings is 10mm. It can be calculated that when the wear coefficient is 0.2, the height deviation of the contact line in the anchor section is 32.62mm, which exceeds the specified value by 30mm; It is 1.74mm, and the change is small.
[0042] Such as image 3 As shown in Fig. 1 , the height change diagram of the contact line under dif...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


