Preloading operation method of a high-altitude tower column crossbeam support

A technology of beam support and operation method, which is applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as heavy workload and difficult realization, and achieve the effect of simple construction, complete technical scheme and unique method

Active Publication Date: 2019-01-22
DONGGUAN UNIV OF TECH
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the conventional method of preloading the brackets of the beams is to use bulk sandbags or water tanks for loading. However, due to the high position of the beams between the tower columns of cable-stayed bridg

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Preloading operation method of a high-altitude tower column crossbeam support
  • Preloading operation method of a high-altitude tower column crossbeam support
  • Preloading operation method of a high-altitude tower column crossbeam support

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0043] like Figure 4 As shown, the dimensions of the beam 2 between the two pylons 1 of the cable-stayed bridge in this embodiment are: a=6.0m, b=3.0m, h=2.0m. The beam is 81.5m away from the bridge deck. In order to pour the concrete of the beam 2 , the supports 3 of the beam 2 need to be preloaded.

[0044] In order to preload the bracket 3 of the beam 2 simply, quickly and effectively, the method of the present invention is used to preload the bracket 3, and the construction is carried out according to the following steps:

[0045] S1 makes the hinged precompression force transmission structure 4, which is formed by connecting the hinged diagonal brace A4a, the hinged diagonal brace B4b, and the force transmission support 4d through the corresponding connection of the steel pin 4g.

[0046] Specifically, the hinged brace A4a is composed of two profiled steels and the male head 4c. There is a gap between the profiled steels. The two profiled steels are integrated by corre...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the field of bridge engineering and discloses a preloading operation method of a high-altitude tower column crossbeam support, which is suitable for cable-stayed bridges, suspension bridges and the like. The method comprises the following steps: S1, a hinged preloading force transmission structure is manufactured. The hinged preloading force transmission structure is formed by a hinged diagonal brace A and a hinged diagonal brace B. The force transmission bracket is connected with a steel pin correspondingly; S2, construction is carried out on that tower column and a support is erected, wherein the tower column is provided with a tower column reserve hole for pas steel wire rope, the horizontal included angle of the tower column reserve hole is 0 DEG, and the bracket legs of the support are embedded in advance and the upper frame bracket legs are embedded in the tower column during construction. After the bracket corbel is finished, the bracket is erected on the bracket corbel, and the upper bracket is erected between the upper bracket corbel. S3, hinged preloading force transmission structure is installed, one end of that steel wire rope is connected withthe articulated preloading force transmission structure, and one end passes through a pre-reserved hole of a tower column; S4, the jack is installed, using the pulling force F (i) n (/i) exerted on the wire rope by the jack; S5, the hinged preload transfer structure and the jack are removed to complete the preload of the bracket.

Description

technical field [0001] The invention relates to the field of bridge engineering, more specifically, to a preloading operation method for a high-altitude tower column beam support, which is suitable for bridges such as cable-stayed bridges and suspension bridges. Background technique [0002] When constructing the pylon beams of cable-stayed bridges (or suspension bridges), it is necessary to set up supports and preload the supports to set up templates to pour the beams between the pylons. In the construction of pouring concrete structures, the purpose of preloading the brackets is: (1) to ensure the safety of the brackets and ensure construction safety; (2) to eliminate the influence of inelastic deformation of the foundation and brackets, and to ensure the pouring quality of the cast-in-place concrete structures. At present, the conventional method of preloading the brackets of the beams is to use bulk sandbags or water tanks for loading. However, due to the high position o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 田俊吴晓伟郑愚孙璨童兵黄文通王晓璐王凤阳潘兆东
Owner DONGGUAN UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products