Control method of train-mounted signal system for on-line double heading of trains

A signal system and control method technology, applied in the direction of locomotives, etc., can solve the problems of complex processing logic, increased signal operation power consumption, inability to realize the connection of different types of trains, etc., so as to increase power consumption and reduce operation and maintenance time. Effect

Active Publication Date: 2019-02-15
HUNAN CRRC TIMES SIGNAL & COMM CO LTD
View PDF10 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the prior art, train reconnection is carried out by two trains of exactly the same type, and it is impossible to realize the connection between different types of trains
[0004] In addition, in the prior art, there is no technical solution for power-off processing of non-control signal devices through hard-wire circuit isolation, thus increasing the power consumption of signal operation and making the processing logic more complicated
[0005] Furthermore, in the prior art, the communication problem of the control devices at both ends after the connection is also a technical problem that needs to be solved urgently, which is related to the automatic end-changing or turning-back of the train.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Control method of train-mounted signal system for on-line double heading of trains
  • Control method of train-mounted signal system for on-line double heading of trains
  • Control method of train-mounted signal system for on-line double heading of trains

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The detailed features and advantages of the present invention are described in detail below in the specific embodiments, the content of which is sufficient to enable any person skilled in the art to understand the technical content of the present invention and implement it accordingly, and according to the specification, claims and drawings disclosed in this specification , those skilled in the art can easily understand the related objects and advantages of the present invention.

[0031] When the train is reconnected, the key point is to identify the state of the train reconnection, and after identifying the state, enable and activate the reconnected head / tail end equipment to control the train.

[0032] figure 1 A typical configuration of an on-board signaling system for a fixed-set train is shown. For fixed-group trains, a set of two-by-two signal equipment (such as figure 1 The on-board signal cabinet shown above), when working normally, the active terminal calcul...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a control method of a train-mounted signal system for on-line double heading of trains. The control method comprises the steps of simultaneously providing a hardwired signal A and a hardwired signal B to the train-mounted signal system through train interface devices, not activating the hardwired signal A or the hardwired signal B in the case of no double heading of the trains, activating the hardwired signal A in the case of double heading of two A-type trains, activating the hardwired signal B in the case of double heading of two B-type trains, simultaneously activating the hardwired signal A and the hardwired signal B in the case of double heading of the A-type train and the B-type train, identifying a double heading type through train-mounted signal devices according to the two received hardwired signals, loading matched train data, performing calculation and train control operation according to the loaded train data, sending a power supply control signal through the train interface devices in the case of double heading of the trains to turn off power supply of non-control devices so as to ensure that the non-control devices quit operation, and reestablishing communication connection between the front and back train-mounted signal devices after double heading of the trains so as to be in charge of the operation and control of the trains.

Description

technical field [0001] The invention relates to an urban rail traffic signal system, in particular to train reconnection operation of the rail traffic signal system. Background technique [0002] Reconnection of trains is a common operation mode of trains, that is, two locomotives are connected to each other, and the locomotive in the forward direction is responsible for the operation. After the trains are reconnected, the number of train carriages is doubled, and the transport capacity is doubled. [0003] In the prior art, train reconnection is performed by two trains of exactly the same type, and it is impossible to realize the connection between different types of trains. [0004] In addition, in the prior art, there is no technical solution for power-off processing of non-control signal devices through hard-wire circuit isolation, thus increasing the power consumption of signal operation and making the processing logic more complicated. [0005] Furthermore, in the pr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): B61C17/00
CPCB61C17/00
Inventor 杨晓荣任颖姜宏阔刘翔鲍旭红田昌宇陈昕李澎东谭力天刘佳政
Owner HUNAN CRRC TIMES SIGNAL & COMM CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products