Blast Furnace Air Supply Branch Installation Method
An installation method and blast furnace technology, applied to blast furnaces, blast furnace details, blast furnace parts, etc., can solve the problems of cumbersome operation, different lengths of air supply pipes, low opening efficiency and precision, etc., to improve installation efficiency and ensure installation Accuracy and the effect of improving the service life
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, so that those skilled in the art can better understand the present invention and implement it, but the examples given are not intended to limit the present invention.
[0028] Such as figure 1 As shown, the present embodiment discloses a blast furnace air supply branch pipe installation method, the blast furnace includes a furnace shell 1, the furnace shell 1 is provided with a tuyere 2, and the outside of the furnace shell 1 is connected with a hot air surrounding pipe 3, and the method includes the following steps:
[0029] 1) Install the jig 4 so that one end of the jig 4 abuts against the tuyere 2, and the other end faces the hot air surrounding pipe 3; in order to improve the precision of the subsequent opening.
[0030] After the fixture 4 is installed, a leveling correction is required, and the error of the position of the fixture after le...