Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A Bid Management Method Based on Bim

A management method and national standard technology, applied in the field of construction information, can solve problems such as drawing scheme review errors and hidden dangers in engineering construction, and achieve the effects of improving review efficiency, avoiding review errors, and improving review quality

Active Publication Date: 2020-09-04
深圳市栋森工程项目管理有限公司
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The existing bidding work requires a lot of manpower to review the documents and plans of the bidding unit. Since the documents and plans are all paper or two-dimensional drawings, it is easy to cause mistakes in the review of the drawing plans during the review, thus affecting the subsequent projects. Construction creates hidden dangers

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Bid Management Method Based on Bim

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0041] A BIM-based bid management method, such as figure 1 shown, including the following steps:

[0042] Step 1: Establish a national standard database according to the national architectural design standards;

[0043] Step 2: Communicate with the bidding unit, complete the bidding materials and prepare bidding documents and task books;

[0044] Step 3: Establish a central server, and transmit the bidding documents and assignment documents to the central server, and create a historical database at the same time;

[0045] Step 4: Establish a BIM review platform in the central server, and connect the BIM review platform with the review terminal of the competent department;

[0046] Step 5: Publish the bidding announcement on the central server; and establish a BIM review platform file upload terminal with the bidding unit;

[0047] Step 6: The bidding unit...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a bidding management method based on BIM, which relates to the field of building information technology. The technical scheme includes the following points: the staff can intuitively understand the attribute situation of the infrastructure building, so that the staff can conveniently carry out fixed-point detection on the infrastructure building, and the work efficiency isimproved.

Description

technical field [0001] The present invention relates to the technical field of building information, more specifically, it relates to a BIM-based bidding management method. Background technique [0002] In recent years, with the comprehensive promotion and widespread circulation of "Internet +" and "Building Informatization", as an important tool and product of building informationization, Building Information Modeling (Building Information Modeling) (hereinafter referred to as BIM) has become the "Internet +" is an indispensable tool in the construction industry, and its implementation method also determines the social and economic benefits of "Internet +" in my country's construction industry. [0003] The existing application publication number is the Chinese invention of CN107909287A, which discloses a method for infrastructure management based on BIM. Create a component tree and create a fly-through model. [0004] The existing bidding work requires a lot of manpower t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/06G06Q50/08
CPCG06Q10/06G06Q50/08
Inventor 卢岭梁立峰汤志杰陈秋旋
Owner 深圳市栋森工程项目管理有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products