A vertical construction node of prefabricated components and its construction method

A technology of prefabricated components and construction methods, which is applied to building components, structural elements, building reinforcements, etc., can solve problems such as explosion of warehouses, grouting of grouting sleeves, and leakage of high-strength mortar, so as to achieve simple construction steps and guarantee Connection strength, the effect of ensuring construction quality

Active Publication Date: 2021-04-13
筑友智造建设科技集团有限公司
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the prior art, because of the high pressure in the connecting chamber between the two prefabricated components, when high-strength mortar is injected into the grouting sleeve, the solidified and formed slurry around the connecting chamber is prone to damage and bursting occurs, while the grouting sleeve During grouting, the high-strength mortar continuously leaks from the burst chamber, which affects the construction progress and quality; resulting in incomplete grouting in the grouting sleeve, and the connection quality of the grouting sleeve cannot be guaranteed, which in turn affects the connection strength of prefabricated components
At present, there is a lack of simple, efficient, versatile and easy-to-operate construction methods for this technical problem.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A vertical construction node of prefabricated components and its construction method
  • A vertical construction node of prefabricated components and its construction method
  • A vertical construction node of prefabricated components and its construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0033] see hint figure 1 , the vertical construction node of the prefabricated component in this embodiment 1, including the second prefabricated component 2 located below and the first prefabricated component 1 located above, the bottom side of the first prefabricated component 1 embedded grouting sleeve 3, the grouting sleeve 3 One end is connected to the stress tendon 11 in the first prefabricated component 1, and the other end is provided with a steel bar connection port (not shown in the figure); placed above the second prefabricated element 2.

[0034] see hint figure 2 During installation, the stress ribs 21 on the top side of the second prefabricated component 2 extend into the inside of the reinforcement connection port of the grouting sleeve 3 on the bottom side of the first prefabricated component 1 . An elastic seal is provided on the surface of the first prefabricated component 1 where it contacts the edge of the second prefabricated component 2 , and the elast...

Embodiment 2

[0043] The vertical construction node of the prefabricated component in this embodiment 2 includes the second prefabricated component 2 at the bottom and the first prefabricated component 1 connected with the second prefabricated component 2 at the top, which is structurally different from that in embodiment 1 in:

[0044] 1. The elastic seal in Embodiment 1 is arranged in the space formed by the seam between the first prefabricated component 1 and the second prefabricated component 2, and the outer edge of the elastic seal does not exceed the bottom side edge of the first prefabricated component 1 (see signal figure 2 ), that is, the elastic seal is placed in the joint; while the elastic seal in embodiment 2 is arranged on the outer edge of the bottom side of the first prefabricated component 1, and is not arranged in the joint space of the two prefabricated components (see the illustration Figure 4 ).

[0045] 2. The clip in embodiment 1 includes a steel plate 6 and a fi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention provides a vertical construction node of a prefabricated component, which includes a first prefabricated component located above and a second prefabricated component located below, and also includes an elastic seal and a clip. The elastic seal is arranged between the first prefabricated component and the second prefabricated component. At the edge of the seam between the prefabricated components, the clip is set on the outer periphery of the elastic seal. The present invention also provides a construction method for the node, including steps: S1, hoisting the second prefabricated component and installing and fixing it, and setting pads on the surface of the second prefabricated component; S2, hoisting the first prefabricated component and setting it at a predetermined position, the second Stress tendons on the top side of the prefabricated component extend into the grouting sleeve on the bottom side of the first prefabricated component; S3, install elastic seals on the edge of the joints of the prefabricated components, and set clamps to fix the elastic seals; S4, inject Inject high-strength mortar into the slurry port, and after it is solidified and formed, remove the clip and remove the elastic seal. In this scheme, the connected warehouse is not easy to explode, the seals can be used repeatedly, the versatility is strong, and the construction steps are simple.

Description

technical field [0001] The invention relates to the technical field of prefabricated buildings, in particular to a construction method for vertical construction nodes of prefabricated components. Background technique [0002] In the construction of prefabricated buildings, pre-embedded sleeve grouting can be used between prefabricated components to realize the reinforcement connection between adjacent prefabricated components. The connection between the upper and lower prefabricated columns is taken as an example. By pre-embedding the grouting sleeve at the bottom of the upper precast column, the top of the grouting sleeve is anchored to the pre-embedded stressed steel bar in the upper precast column, and the bottom end is provided with a steel bar connection. mouth. During construction, the upper and lower prefabricated columns are assembled, and the steel bars of the lower prefabricated components extend into the steel bar connection ports at the bottom of the grouting sl...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04C5/16
CPCE04C5/165
Inventor 肖阿林唐雄
Owner 筑友智造建设科技集团有限公司