Comprehensive evaluation method for a power grid planning scheme under a wind power grid-connected condition

A technology for power grid planning and comprehensive evaluation, which can be used in instruments, data processing applications, information technology support systems, etc.

Inactive Publication Date: 2019-04-02
RES INST OF ECONOMICS & TECH STATE GRID SHANDONG ELECTRIC POWER +1
View PDF8 Cites 11 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0012] The purpose of the present invention is to overcome the deficiency that the influence factors of large-scale wind power grid integration cannot be considered in the compr

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Comprehensive evaluation method for a power grid planning scheme under a wind power grid-connected condition
  • Comprehensive evaluation method for a power grid planning scheme under a wind power grid-connected condition
  • Comprehensive evaluation method for a power grid planning scheme under a wind power grid-connected condition

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0057] The present invention proposes a comprehensive evaluation method for grid planning schemes under the condition of wind power grid-connected, and the present invention will be further described in detail below in conjunction with specific embodiments.

[0058] The present invention proposes a method for comprehensive evaluation of power grid planning under the condition of wind power grid-connected, including the following steps:

[0059] 1) Obtain n power grid planning schemes to be evaluated, and establish a power grid planning scheme set to be evaluated, n is a positive integer; the i-th power grid planning scheme case to be evaluated i , to obtain the corresponding technical parameters, including: load data, power source data, and grid data; n power grid planning schemes to be evaluated together form a set of schemes to be evaluated CASE={case 1 , case 2 , case 3 ,..., case n}, the scheme includes n groups of the same load data and power data, and n groups of diff...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a comprehensive evaluation method for a power grid planning scheme under a wind power grid connection condition, and belongs to the field of power system planning scheme evaluation. The method comprises the following steps of firstly, establishing a to-be-evaluated power grid planning scheme set, then constructing a power grid planning scheme comprehensive evaluation indexsystem comprising five evaluation dimensions and three evaluation levels, and setting the weight of each evaluation index; calculating a score value of a technical layer evaluation index for each to-be-evaluated power grid planning scheme, further obtaining a comprehensive evaluation value of each to-be-evaluated power grid planning scheme, and obtaining a power grid planning scheme with optimal comprehensive evaluation. According to the method, the influence of large-scale wind power grid connection on power grid planning can be considered, and the most reasonable power grid planning scheme is obtained, so that the wind power consumption level is improved, and the operation safety and efficiency of a power system are improved.

Description

technical field [0001] The invention belongs to the field of power system planning and evaluation, and in particular relates to a method for comprehensive evaluation of power grid planning schemes under the condition of wind power grid-connected. Background technique [0002] In recent years, wind power has developed rapidly in my country, and the installed capacity and power generation have continued to increase. In 2017, the accumulative grid-connected installed capacity of wind power across the country reached 164 million kilowatts, accounting for 9.2% of the total installed capacity of power generation, and the wind power generation was 305.7 billion kWh, accounting for 4.8% of the total power generation. Wind power technology is relatively mature, and its cost keeps falling. In the future, it will still be an important means for my country to further promote the energy production and consumption revolution and promote the prevention and control of air pollution. It is e...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/06
CPCG06Q10/06313G06Q10/0639G06Q50/06Y02E40/70Y04S10/50
Inventor 田鑫李雪亮张健吴健赵龙王艳郑志杰牟宏汪湲刘晓明张杰高晓楠张家宁刘冬牟颖贾善杰李勃朱毅高效海魏鑫魏佳张宁
Owner RES INST OF ECONOMICS & TECH STATE GRID SHANDONG ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products