Valve configuration method for efficient and safe operation of eight-nozzle group steam turbine
A technology of safe operation and configuration method, applied in mechanical equipment, engine components, machines/engines, etc., to achieve the effect of ensuring economy, reducing the number of tests, and improving competitiveness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0033] Specific implementation mode one: the following combination figure 1 Describe this embodiment, the valve configuration method for the efficient and safe operation of the eight-nozzle group steam turbine described in this embodiment, the specific process is:
[0034] S1: Obtain the optimal "4+2+2" steam intake method according to the data of the valve sequence of the existing unit;
[0035] S2: According to the "4+2+2" steam inlet method obtained in S1, it is split into the corresponding "2+2+1+1+1+1" steam inlet test method;
[0036] S3: Obtain the valve status of the unit according to the operation data of the valve of the unit, filter and adjust the opening sequence of the valve according to the valve status, and obtain the steam inlet mode after screening and adjustment of "2+2+1+1+1+1";
[0037] S4: According to the "2+2+1+1+1+1" obtained in S3, the steam inlet mode is screened and adjusted to conduct a valve switch test to obtain the optimal "2+2+1+1+1+1" steam in...
specific Embodiment approach 2
[0040] Embodiment 2: This embodiment further explains Embodiment 1. The acquisition method of the valve sequence data of the existing unit mentioned in S1 includes: historical operation data and the steam intake law curve of the sequence valve in the DCS system of the unit.
specific Embodiment approach 3
[0041] Specific implementation mode 3: This implementation mode further explains the implementation mode 1. According to S1, the optimal "4+2+2" steam inlet mode is obtained according to the data of the valve sequence of the existing unit. The specific method is as follows:
[0042]S1-1: Determine the "4+2+2" steam intake mode of the unit operation. If it is diagonal steam intake, execute S1-2. If it is upper cylinder intake steam, lower cylinder intake steam or side cylinder intake steam, execute S1. -3;
[0043] S1-2: Obtain the current state of the unit, and judge whether it is necessary to re-test according to the current state of the unit. If so, execute S1-3. If not, the current steam intake mode is the optimal "4+2+2" steam intake mode by default;
[0044] S1-3: Conduct a test of the valve opening sequence to obtain the optimal "4+2+2" steam intake method.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


