Drilling fluid construction cost prediction method and device

A technology of construction cost and prediction method, applied in the field of oil and gas drilling engineering, can solve the problems of large drilling cost estimation error, inability to accurately reflect the use and distribution of drilling fluid cost, and failure to distinguish the main formula of drilling fluid and maintenance formula, etc. Prediction Accuracy, Accuracy Credibility, and Effect of Improving Accuracy

Pending Publication Date: 2019-05-14
PETROCHINA CO LTD
View PDF4 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, the empirical estimation method, technical measurement method and operation cost method in the existing drilling fluid cost prediction methods are all obtained based on manual experience and a small amount of test data, and are greatly affected by the geological conditions of the drilling construction site and the drilling process. The estimation error is relatively large, so it is impossible to establish an objective and accurate cost budget system
However, the statistical analysis method does not distinguish between the main formula of drilling fluid and the maintenance formula, and does not accurately simulate the usage of drilling fluid at the construction site, so it cannot accurately reflect the actual usage and distribution of drilling fluid costs
Therefore, the traditional drilling fluid cost prediction method has low prediction accuracy for drilling fluid cost and cannot provide real and effective guidance for drilling fluid cost in actual production

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Drilling fluid construction cost prediction method and device
  • Drilling fluid construction cost prediction method and device
  • Drilling fluid construction cost prediction method and device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0065] figure 1 It is a schematic flowchart of the drilling fluid construction cost prediction method provided in Embodiment 1 of the present invention. figure 2 It is a schematic flow chart of determining the consumption of the main formula in the drilling fluid construction cost prediction method provided in Embodiment 1 of the present invention. image 3 It is a schematic flowchart of determining the consumption of maintenance formula in the drilling fluid construction cost prediction method provided in Embodiment 1 of the present invention. Figure 4 It is a schematic flowchart of determining the drilling fluid consumption coefficient per meter of the well to be measured in the drilling fluid construction cost prediction method provided in Embodiment 1 of the present invention. Figure 5 It is a schematic flowchart of determining the daily drilling fluid consumption coefficient of the well to be measured in the drilling fluid construction cost prediction method provided ...

Embodiment 2

[0141] Figure 9 A schematic structural diagram of the drilling fluid construction cost prediction device provided in Embodiment 2 of the present invention, as shown in Figure 9 As shown, Embodiment 2 of the present invention provides a drilling fluid construction cost prediction device 40, including: data collection device 41, data transmission device 42, data processing device 43 and data output device 44, data collection device 41, data transmission device 42 Both the data output device 44 and the data processing device 43 are electrically connected.

[0142] The data collection device 41 is used to obtain the main formula and maintenance formula of the drilling fluid of multiple adjacent wells in the block where the well to be measured is located, as well as the unit price of the main formula and the unit price of the maintenance formula, and combine the drilling fluid of multiple adjacent wells The main formula and the maintenance formula, as well as the unit price of t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a drilling fluid construction cost prediction method and device. The method comprises: main body formulas and maintenance formulas of drilling fluids of multiple adjacent wellsin a block where a to-be-logged well is located, and unit prices of the main body formulas and unit prices of the maintenance formulas are obtained; wherein the drilling fluid with the main body formula is used for drilling circulation, and the drilling fluid with the maintenance formula is used for supplementing consumption of the drilling fluid in drilling circulation; determining a main formulaand a maintenance formula of the drilling fluid to be logged according to the main formulas and the maintenance formulas of the drilling fluids of the adjacent wells; and according to the main formula and the maintenance formula of the to-be-logged well, the consumption of the main formula, the consumption of the maintenance formula, the unit price of the main formula and the unit price of the maintenance formula, the drilling fluid cost of the to-be-logged well is determined. According to the drilling fluid construction cost prediction method and device, various drilling fluid consumption types and consumption in the drilling construction process can be fully considered, and objective, accurate and high-reliability prediction is provided for the drilling fluid construction cost.

Description

technical field [0001] The invention relates to the technical field of oil and gas drilling engineering, in particular to a drilling fluid construction cost prediction method and device. Background technique [0002] Drilling fluid is the "blood" of drilling engineering, and the quality of drilling fluid directly affects the drilling speed. A high-quality drilling fluid system can not only reduce drilling accidents, increase ROP, save drilling cycle and drilling fluid cost. According to the drilling fluid construction experience in recent years, it is found that the quality of drilling fluid construction is greatly controlled by the drilling fluid construction cost in addition to the drilling fluid technology. Engineering investment will have a direct impact, and scientific and reasonable budgeting of drilling fluid costs is conducive to ensuring the realization of the overall goal of oil and gas field exploration and development. [0003] At present, the methods of drilli...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/02
Inventor 李家学滕学清朱金智王家梁张绍俊徐兴梁李磊刘毅张丽萍王涛
Owner PETROCHINA CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products