Excavation relaxation treatment method for rock mass dam foundation with multi-layered structure
A multi-layer structure, excavation relaxation technology, applied in the direction of excavation, infrastructure engineering, construction, etc., can solve the problems of low construction efficiency and difficult to control the excavation quality of the upper rock mass, so as to improve the construction efficiency and improve the excavation molding. Effects, effects of controlling relaxation and damage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] see Figure 1-4 A method for treating relaxation of a multi-layer structure rock mass dam foundation excavation comprises the following steps:
[0034] Step1: Excavate to the top surface of the protective layer 2: From top to bottom, excavate in layered steps to the elevation of the top surface of the protective layer 2 of the reserved protective layer 3, where the thickness of the reserved protective layer 3 is 3~5m;
[0035] Step2: Pre-reinforce the structural surface 1: judge the development of the internal structural surface of the dam foundation retained rock mass 9 according to the survey data, judge whether there is a long and large structural surface, and use the anchor rod 11 to retain the dam foundation below the reserved protective layer 3 The rock mass 9 is anchored in advance;
[0036] Step3: Pre-consolidation grouting for the retained rock mass 9 of the dam foundation: after the pre-reinforcement of the bolt 11 is completed, perform pre-consolidation grou...
Embodiment 2
[0047] The excavation of the dam foundation of a water conservancy and hydropower project adopts the above-mentioned relaxation treatment method for the excavation of the multi-layer structure rock mass dam foundation. From top to bottom, there are 4 layers of rock formations, the reserved protective layer 3 is columnar joint basalt, and downwards are distributed successively with breccia lava, columnar joint basalt, and oblique porphyry basalt. According to the technical requirements of dam foundation excavation, a layer of protective layer is reserved for blasting excavation, and the thickness of the protective layer is 5m; the existing structural surface 1 is pre-reinforced, and the bolt is vertical to the structural surface, and the reserved protective layer for blasting is proposed The inside is a hollow hole, and the anchor rod only reinforces the rock mass retained on the foundation surface. After the anchoring is completed, basalt fiber mortar concrete is used for pre-...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com