Comprehensive energy balance scheduling method for industrial park
A technology that integrates energy and scheduling methods, applied in the energy field, can solve problems such as low scheduling efficiency of energy interconnection systems
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0076] The technical solution of the present invention will be further explained below in conjunction with the accompanying drawings.
[0077] like figure 1 As shown, the industrial park comprehensive energy balance scheduling method of the present invention specifically includes the following steps:
[0078] Step 1. Obtain the starting moment of the optimization period, determine the optimization period N and each group of scheduling intervals {T 1 ,T 2 ,...,T i ,...,T n}, wherein, the scheduling interval is the time interval between two schedulings; n is the total number of scheduling intervals included in the optimization cycle; the optimization cycle is the total time the scheduling method runs, namely
[0079] Step 2. Obtain the topological structure and subsystem information of the energy system; obtain the real-time prices of various energy sources (such as grid power and natural gas), and calculate each energy in each scheduling interval from the starting time ac...
PUM

Abstract
Description
Claims
Application Information

- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com