A blasting drilling device for blasting construction that is convenient for drilling multiple blast holes
A drilling device and drilling technology, which are applied in the directions of earth-moving drilling, supporting devices, drilling equipment and methods, etc., can solve the problems of long time consumption, affecting the tunnel construction period, large manpower and material resources, etc., and achieve a large detonation range, Good detonation effect and high efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Such as figure 1 As shown, this embodiment provides a blasting drilling device for blasting construction that is convenient for drilling multiple blast holes, including a base 1 and a longitudinal mounting seat 9, and a universal wheel 101 with a brake is provided under the base, which can be used according to The base needs to be pushed or positioned by braking the swivel wheels.
[0031] A first drilling rig 2 is provided on one lateral side of the longitudinal mounting base (the first drilling rig can be a rotary drilling rig in the prior art, and the bore diameter range is 200-1200mm, and the specific model is selected according to actual needs), and the other There is a mounting end 10 on the side, and the second rod group and the first rod group are arranged in turn on the mounting end; the brake is opened to move the base to the blasting construction site, and since the longitudinal mounting seat is horizontally displaced on the base, the second A drilling rig f...
Embodiment 2
[0041] Such as figure 2 As shown, this embodiment provides a blasting drilling device for blasting construction that is convenient for drilling multiple blast holes, including a base 1 and a longitudinal mounting seat 9, and a universal wheel 101 with a brake is provided under the base, which can be used according to The base needs to be pushed or positioned by braking the swivel wheels.
[0042] A first drilling rig 2 is provided on one lateral side of the longitudinal mounting base (the first drilling rig can be a rotary drilling rig in the prior art, and the bore diameter range is 200-1200mm, and the specific model is selected according to actual needs), and the other There is a mounting end 10 on the side, and the second rod group and the first rod group are arranged in turn on the mounting end; the brake is opened to move the base to the blasting construction site, and since the longitudinal mounting seat is horizontally displaced on the base, the second A drilling rig ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


