A hole-forming method in the construction of filling and grouting to strengthen the soil layer around the traction pipe
A technology of pulling pipes during construction, which is applied in soil protection, infrastructure engineering, construction, etc., and can solve problems such as uncertainty about whether it is completely filled, ground subsidence, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0020] A specific embodiment of the hole-forming method in the construction of the soil layer around the filling and grouting reinforcement of the traction pipe according to the present invention. The traction pipe is a pipeline crossing railways and highways, and the purpose is to ensure the safety of railways and highways, and is especially suitable for urban areas Pipe laying in progress. Since the traction tube is located in an area with a large flow of people and vehicles, it is necessary to strengthen the foundation soil around the traction tube to prevent the ground from collapsing. The grouting reinforcement of the foundation soil layer around the traction tube is...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
