A technology of power grid equipment and state, applied in the direction of circuit breaker testing, measuring electricity, measuring devices, etc., can solve the problems of unstable use of power grid equipment and easy scrapping, and achieve the effects of avoiding unstable power supply, accurate judgment, and accurate statistics
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0029] The invention provides a method for monitoring the state of power grid equipment. The state of the power grid equipment includes the use state of capacitor circuit breakers and the use state of outlet switch circuit breakers. The method for monitoring the state of power grid equipment includes the following steps:
[0030] a. Set the capacitor closing limit A1 and the switch closing limit B1;
[0031] b. Set the capacitor closing warning value A2 and the switch closing warning value B2;
[0032] c. Count the effective closing times A3 of capacitors and the effective closing times B3 of switches;
[0033] d. Judging the use status of the capacitor circuit breaker. When A3≤A2, the capacitor circuit breaker is in a normal state; when A2<A3≤A1, the capacitor circuit breaker is in an early warning state;
[0034] e. Judging the use status of the outlet switch circuit breaker. When B3≤B2, the outlet switch circuit breaker is in the normal state; when B2<B3≤B1, the outlet swi...
Embodiment 2
[0046] The main difference between this embodiment and the first embodiment is that it also includes the monitoring of the load status of the main transformer.
[0047] The grid power supply status also includes the load status of the main transformer, the rated capacity of the main transformer is P2, the main transformer load alert rate C1 and the main transformer load warning rate C2 are set, the active power value P1 of the high voltage side of the main transformer is counted, and the main transformer load rate C3=P1 / When P2, C3≤C1, the main transformer load is in the normal state, when C11, the main transformer load is overloaded. The advantage of this setting is that the staff can check the load of the main transformer of the grid equipment at any time to understand the operation of the grid equipment. If the load of the main transformer is in an early warning state or overloaded state, the staff can perform maintenance in time to improve the grid power supply. stabilit...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com