Power distribution network overall planning method and system

The invention provides a power distribution network overall planning method and system. The power distribution network overall planning method includes the steps: 1) dividing power supply areas; 2) determining the power supply area attribute and the planning strategy; 3) carding the present situation of grids; 4) predicting load; 5) determining the planning target; 6) dividing the power supply grids; 7) planning a power supply grid present situation wiring diagram and a target wiring diagram; 8) determining the planning scheme and the transitional scheme; 9) forming concrete implementation projects; and 10) compiling the line channel planning. The power distribution network overall planning method and system can systematically guide planning and construct a medium voltage power distribution network rack so as to guarantee reliability and firmness of the medium voltage power distribution network. The power distribution network overall planning method and system can construct a power distribution network with necessary capacity margin, proper load transferring capability, certain self-healing capability and emergency processing capability, and reasonable distributed power supply admission capability, and can safely, reliably and economically supply power for the user.
Owner:TIANDAQIUSHI ELECTRIC POWER HIGH TECH CO LTD

Auxiliary power supply system for motor train unit and fault load reducing method

ActiveCN103935246AGuaranteed operating safety factorLow redundancy requirementElectric devicesElectric powerLow voltageAuxiliary power unit
The invention relates to an auxiliary power supply system for a motor train unit and a power supply method and a load reducing method of the auxiliary power supply system. The auxiliary power supply system for the motor train unit comprises auxiliary current transformers, a bus I, a bus II, bus connectors, a contactor box, medium-voltage loads and a low-voltage power supply system. The bus I and the bus II penetrate through the whole auxiliary motor train unit through the bus connectors on the two sides of carriages. The auxiliary current transformers and the medium-voltage loads are connected with the bus I or the bus II alternately according to the parity number of the motor train unit carriages. Part of the medium-voltage loads of the motor train unit operate in a load reducing mode or are directly disconnected when the auxiliary current transformers break down. The auxiliary power supply system operates in a parallel connection mode through the buses penetrating through the whole auxiliary motor train unit, the relative concentration and flexible arrangement eliminating mode of the motor train unit is achieved, the requirement for the redundancy of each set of auxiliary current exchanging system is low, the economic cost is greatly reduced, the power supply of the whole train unit is stable and reliable, and the passenger comfort level and the running safety coefficient of the motor train unit are guaranteed.
Owner:CRRC QINGDAO SIFANG ROLLING STOCK RES INST

Solar photovoltaic off-grid and grid-connected multi-mode generating system

The invention relates to solar photovoltaic generating applications, and in particular relates to a multi-mode photovoltaic generating system, wherein the multi-mode photovoltaic generating system mainly adopts off-grid power generation, and can release gird-connected power generation as for the surplus electric energy which is not consumed completely by a DC (direct-current) emergency load and storage batteries. The system comprises a controller, solar-cell arrays, a storage battery, the DC emergency load, a grid-connected inverter and a public distribution network, wherein a part of DC electric energy output by the solar-cell arrays is supplied for the DC emergency load by a DC bus, and the other part of the DC electric energy output by the solar-cell arrays is stored in the storage batteries. When the voltage of the DC bus is out of the normal range, the storage batteries supply the energy for the DC emergency load by a charge-discharge controller; and when the storage batteries finish the charging and the voltage of the DC bus is within the normal range, the surplus DC electric energy can be converted into AC (alternating-current) electric energy by a DC boost converter and a grid-connected inverter and then the AC electric energy is transmitted to the public distribution network. The system provided by the invention can improve the efficiency and the time of annual power generation of the system, and has good application prospects.
Owner:WUHAN TEXTILE UNIV

Device and method for data transmission during underground integrated communication

The invention provides a device and a method for data transmission during underground integrated communication, and belongs to the field of petrochemical industry. According to the invention, triggering and information transmission of a PLC (Programmable Logic Controller) are achieved by using an RFID (Radio Frequency Identification Device) technology. An RFID reader / writer is embedded under an oil well; and double-way control and data communication between the RFID reader / writer and a valve control PLC are achieved; when the PLC is required to execute an action, an RFID passive electronic label containing an operating instruction is put from a wellhead; and when the RFID passive electronic label passes through the RFID reader / writer, the RFID reader / writer is used for reading the operating instruction and transmitting the operating instruction to the PLC to execute corresponding operation, so as to operate an underground intelligent water distributor. Through the adoption of the data transmission device and method provided by the invention, cable investment can be greatly saved, the reliability is greatly enhanced and long-time continuous working is guaranteed because an energy saving mode is obtained; according to the invention, false actions can be avoided through the adoption of multiple safety measures; according to the invention, through customizing and packaging, the used electronic label can be used for bearing severe underground working environments; and according to the invention, history data local storage and post analysis functions are supported; and according to the invention, the accuracy and reliability are enhanced when the labor cost is reduced.
Owner:CHINA PETROLEUM & CHEM CORP +1

Combined single-phase/three-phase alternating current voltage stabilizer based on digital circuit control

The invention relates to a multi-single-phase / three-phase alternating current voltage stabilizer based on digital circuit control. The voltage stabilizer comprises: an input terminal is connected with three compensation transformers of a power grid, an output terminal is connected to an input terminal of electrical equipment via series connection of primary windings of the three transformers, and secondary winding terminals of the three transformers are connected to an output voltage terminal via 8 bidirectional thyristors, a TR4 transformer at an input voltage side provides real-time voltage detection signals, alternating current effective value detection is conducted via a 12-bit high-precision A / D converter, single-phase alternating current work voltage is monitored in real time, obtained high 9-bit digital signals and a set coding amount value are compared, the 8 bidirectional thyristors are determined, combined, and triggered via a decoding driving circuit according to a hardware logic programming regulation, the employed group number of secondary windings of the transformers and the voltage direction are changed via different combinations of turn-on and turn-off of the bidirectional thyristors, different compensation combinations for measuring the voltage at one step are finally achieved, and the output voltage is guaranteed to be stabilized in a given voltage range.
Owner:SKILL TRAINING CENT STATE GRID JIBEI ELECTRONICS POWER COMPANY +2

Ordered charging method for electric vehicle based on multi-agent system

The invention relates to an ordered charging method for an electric vehicle based on a multi-agent system. The method is realized through a cooperation of a transmission transformer load monitoring agent, a distribution transformer load monitoring agent, an electric vehicle charging agent, an intelligent appliance control agent, an intelligent interactive control agent and a comprehensive decision agent. The distribution transformer load monitoring agent receives uploaded data from the intelligent interactive control agent and the electric vehicle charging agent and load data of the transmission transformer, performs a logical judgment by using an ordered electric vehicle charging and control strategy based on the zone area load group according to the collected data, and returns a control and execution instruction to the intelligent interactive control agent and the electric vehicle charging agent after acquiring the control and execution instruction. With adopting the method provided by the present invention, functions of ordered electric vehicle charging, power fluctuation restraining and economic dispatch are realized, the problems of insufficient real-time processing capability, dimensionality curse, and the like in the existing optimization method are solved. In addition, the method provided by the present invention is applicable for charging control of the family passenger electric vehicle.
Owner:ELECTRIC POWER RES INST STATE GRID JIANGXI ELECTRIC POWER CO +1

Non-contact multiple input voltage source type resonant converter

The invention relates to a non-contact multiple input voltage source type resonant converter, belonging to the electric energy transformation field. The resonant converter comprises a primary side circuit, a multiple winding non-contact transformer (4) and a secondary side circuit; wherein the primary side circuit is composed of n energy input branches, each branch is formed by sequentially connecting an input source (1), a voltage source type contravariant bridge (2) and a primary resonant network (3) on one primary side winding of the multiple winding non-contact transformer (4) in series; nprimary side windings of the multiple winding non-contact transformer (4) are tightly coupled, the primary side and the secondary side are relatively movable; the secondary side circuit is formed bysequentially connecting a secondary side resonant network (5) and a rectifying and filtering circuit (6) in series; and in the n energy input branches, the primary side resonant networks of at least n-1 branches includes a series inductance. Inherent current source characteristic of the voltage source type resonant converter and tightly coupled primary side multiple winding realize multiple inputsource time-sharing/simultaneous multiple mode power supply; and non-contact power supply ensures safety and convenience.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS

Method for dispatching power grid pitch peak capability based on large-scale wind power sychronization

The invention relates to the field of planning and dispatching of a power grid, and discloses a method for dispatching power grid pitch peak capability based on large-scale wind power sychronization. The method comprises the following steps: (1) setting the pitch peak capacity provided by hydropower for wind power as F, and the sum of wind power and hydropower as a definite value, F plus Q; leading Wa plus Wi to be more than or equal to (F plus Q) multiplied by 24, conducting pilot calculation on maximum output Fa of wind power allowed by the power grid; (2) substituting Fa into an analog computation model run by a given power grid system, carrying out calculation to obtain load rate of fire power with a light load and a difference F fire between fire power output and fire power minimum output under the load rate, which are taken as the pitch peak capacity provided by the fire power for wind power; and (3) when F fire is less than 0, decreasing wind power output Fa value capable of being balanced by hydropower, and repeating the step (2) until F fire is more than or equal to 0, thus obtaining the total pitch peak capacity provided by the given power grid system for wind power: total F equals to Fa plus F fire, wherein total F is wind power capacity capable of being integrated into the given power grid system.
Owner:NORTHWEST CHINA GRID

Method for online monitoring of work state of on-load tap-changer and early warning

InactiveCN105759200ATimely detection of running statusGuaranteed to workCircuit interrupters testingEngineeringTransition time
The invention relates to a method for online monitoring work state of an on-load tap-changer and early warning. The method comprises the following steps: 1. real-time acquiring voltages and current parameters of a branch element of a transition contact of the on-load tap-changer; 2. based on the acquired voltages and current parameters, computing the following parameters: a transition resistance, a transition time, a transition waveform, a three phase synchronization, a contact resistance, an action program; 3. determining the state of a device and communicating with the outside by using a communication module through the on-load tap-changer main body, implementing real-time monitoring whether the on-load tap-changer is working normally so as to send an alarm in time and turn off the device for maintenance, and establishing an early warning mechanism. According to the invention, the method implements online monitoring of OLTC work state, acquires OLTC real-time device parameters, and determines whether OLTC works normally so as to turn off the device for maintenance, prevents occurrence of accidents, and lowers property loss. At the same time, the method conducts analysis and computing on historical data, establishes the early warning mechanism prior to events, and exits an operation state in advance.
Owner:CHINA AGRI UNIV

Ship DC integrated power propulsion system and protection design method of system

The invention relates to a ship DC integrated power propulsion system and a protection design method of the system, and solves the problem that the existing protection methods cannot achieve selectiveprotection of DC integrated power systems. The protection of each frequency conversion module of the DC-side busbar uses fuses as protection devices, and the protection of the generator and its output-side cables is achieved by detecting the imbalance of phase-to-phase current or phase-to-phase voltage by a self-developed generator protection device. In the case of a short-circuit fault of the DCbusbar itself, the invention proposes two protection schemes based on a fuse with an isolating switch and a solid-state circuit breaker. The protection of the propulsion motor and the load-side equipment can be realized by an inverter unit, and the DC system protection design scheme is realized by the methods such as insulation detection in conjunction with a comprehensive control system for theground fault, so that the non-fault side busbar can continuously power while the short-circuit fault is accurately and quickly removed, thereby realizing the system protection selective scheme and ensuing the reliability and safety of the power supply of the ship's power system.
Owner:中国船舶重工集团公司第七0四研究所

Power supply and distribution control device for unmanned aerial vehicle

The invention discloses a power supply and distribution control device for an unmanned aerial vehicle. The power supply and distribution control device can reliably supply electricity and can achieve high efficiency, intelligentization, universalization and miniaturization. The power supply and distribution control device comprises a power supply control module, an airborne generator, a standby battery pack and a ground DC stabilized power supply, wherein the airborne generator is configured to supply electric energy to airborne electronic equipment of the unmanned aerial vehicle when the rotating speed of an engine is greater than an appointed threshold and to charge the standby battery pack which is not fully charged; the standby battery pack is configured to provide electric energy to the airborne electronic equipment of the unmanned aerial vehicle when the rotating speed of the engine is smaller than the appointed threshold or the engine is broken down; the ground DC stabilized power supply is configured to supply electricity when ground debugging is carried out and to charge the standby battery pack which is not fully charged; and the power supply control module is configured to be switched among three power supplies of the airborne generator, the standby battery pack and the ground DC stabilized power supply and to carry out serial port communication.
Owner:HIWING AVIATION GENERAL EQUIP

Power outage plan optimization decision method aiming at reducing power outage time and quantity

A power outage plan optimization decision method aiming at reducing power outage time and quantity comprises the following steps: reading the topology information of a distribution network, and establishing the contact relationship between distribution network components in a region to be evaluated to form a contact matrix; reading the information of each load point in the distribution network; reading power outage event information; for each type of power outage events, reading the information of maintenance teams in the region to be evaluated (including the number BN of the maintenance teams in the region to be evaluated, the ability of the maintenance teams and the daily workload of the maintenance teams), and making clear the power outage strategy in the region to be evaluated; optimizing the power outage period; optimizing the power outage order; and displaying the result. The method takes the user's power outage time, the user satisfaction and the team's ability into full consideration, and adopts simultaneous maintenance. For different power outage events, the execution time of each power outage time is optimized based on the daily load curve of an affected region. Thus, the power outage time and power outage quantity of the system are reduced effectively, reliable power supply of the system is ensured, and the customer satisfaction is improved.
Owner:ELECTRIC POWER RESEARCH INSTITUTE, CHINA SOUTHERN POWER GRID CO LTD +1

Ecological restoration system for riverway and restoration method thereof

The invention provides an ecological restoration system for a riverway and a restoration method thereof. The ecological restoration system comprises a new energy source power generation device, an electrical control device, a water quality online detection system, an aeration device, a microorganism culture device and a support device, wherein the support device comprises a floating body worktable; the aeration device comprises an air blower; the new energy source power generation device, the electrical control device, the water quality online detection system and the air blower are respectively arranged at the upper surface of the floating body worktable; the microorganism culture device is arranged at the lower surface of the floating body worktable. The ecological restoration system hasthe beneficial effects that 1, the anaerobic and aerobic bacteria are directionally cultured by microorganisms through a novel riverway control technology, so as to eliminate the bottom sludge and the pollution to the water body, and break through the riverway control limitation of the conventional single aerobic biochemical method; 2, the clean solar energy and a wind power generation system areadopted, so as to maintain stable and reliable power supply, and save the electric energy.
Owner:上海汀滢环保科技有限公司 +1

Switch structure with overload protection

A switch includes a casing and first and second conductive blades. A conductive strip made of a material that bends when subject to a temperature rise is fixed to the first blade and has a free end. A conductive plate is arranged inside the casing and in electrical connection with the second blade and movable between an engaged position where the conductive plate engages the conductive strip to form an electrical connection between the first and second blades and a disengaged position where the conductive plate disengages from the conductive strip to electrically disconnect the second blade from the first blade. When an overload occurs, an excessive current flows through the conductive strip, causing the strip to bend from a normal operation condition to a breaking condition that separates the conductive strip from the conductive plate. A link is coupled to the conductive plate and defines an elongated slot receiving the free end of the conductive strip therein. The elongated slot allows the conductive plate to move between the engaged and disengaged positions without causing movement of the conductive strip while when the conductive strip is in the breaking condition, the link drivingly couples the conductive strip to the conductive plate for returning the conductive strip back to the normal operation condition. A leaf spring is pivoted between the casing and the conductive strip to retain the conductive strip in the breaking condition until the conductive strip is driven by the link back to the normal operation condition.
Owner:YU TSUNG MOU

Externally-powered electric engineering machinery

The invention provides externally-powered electric engineering machinery. The externally-powered electric engineering machinery comprises a mobile power supply vehicle and an electric engineering machine. The mobile power supply vehicle comprises a mobile vehicle body. A power unit and a cable take-up and pay-off device are mounted on the vehicle body. The electric engineering machine comprises an engineering vehicle body capable of moving freely, wherein an electric motor, a power control device, an operation control center and a power collection arm are arranged in the vehicle body. By adopting the externally-powered electric engineering machinery, the problem of cable connection between power supply equipment and electric equipment when electric engineering machinery moves to work is solved; it is guaranteed that cables do not hinder free movement of the electric equipment within a certain scope, and reliable electric power supply is guaranteed; and the externally-powered electric engineering machinery is good in work rotation capability and high in environmental adaptability, and the advantages are more obvious in working regions with oil and gas shortage. Meanwhile, the power supply equipment and the electric equipment can conduct signal communication, and use safety of the cables is ensured.
Owner:杭州蓝力电动科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products