Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

32results about How to "Optimize execution time" patented technology

Power outage plan optimization decision method aiming at reducing power outage time and quantity

A power outage plan optimization decision method aiming at reducing power outage time and quantity comprises the following steps: reading the topology information of a distribution network, and establishing the contact relationship between distribution network components in a region to be evaluated to form a contact matrix; reading the information of each load point in the distribution network; reading power outage event information; for each type of power outage events, reading the information of maintenance teams in the region to be evaluated (including the number BN of the maintenance teams in the region to be evaluated, the ability of the maintenance teams and the daily workload of the maintenance teams), and making clear the power outage strategy in the region to be evaluated; optimizing the power outage period; optimizing the power outage order; and displaying the result. The method takes the user's power outage time, the user satisfaction and the team's ability into full consideration, and adopts simultaneous maintenance. For different power outage events, the execution time of each power outage time is optimized based on the daily load curve of an affected region. Thus, the power outage time and power outage quantity of the system are reduced effectively, reliable power supply of the system is ensured, and the customer satisfaction is improved.
Owner:ELECTRIC POWER RESEARCH INSTITUTE, CHINA SOUTHERN POWER GRID CO LTD +1

Optimal decision-making method for outage planning with the goal of reducing outage time and power

A power outage plan optimization decision method aiming at reducing power outage time and quantity comprises the following steps: reading the topology information of a distribution network, and establishing the contact relationship between distribution network components in a region to be evaluated to form a contact matrix; reading the information of each load point in the distribution network; reading power outage event information; for each type of power outage events, reading the information of maintenance teams in the region to be evaluated (including the number BN of the maintenance teams in the region to be evaluated, the ability of the maintenance teams and the daily workload of the maintenance teams), and making clear the power outage strategy in the region to be evaluated; optimizing the power outage period; optimizing the power outage order; and displaying the result. The method takes the user's power outage time, the user satisfaction and the team's ability into full consideration, and adopts simultaneous maintenance. For different power outage events, the execution time of each power outage time is optimized based on the daily load curve of an affected region. Thus, the power outage time and power outage quantity of the system are reduced effectively, reliable power supply of the system is ensured, and the customer satisfaction is improved.
Owner:ELECTRIC POWER RESEARCH INSTITUTE, CHINA SOUTHERN POWER GRID CO LTD +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products