The invention provides a parameterized regulation and
storage pool construction method and equipment, and relates to the field of
water supply and drainage
engineering.The parameterized regulation and
storage pool construction method comprises the steps that S1, a design parameter set of a regulation and
storage pool is obtained, and a module parameter set and an equipment parameter set of the regulation and storage
pool are obtained through calculation of the design parameter set; s2, setting a module coordinate set and an equipment coordinate set of the regulation and storage
pool through a design parameter set, a module parameter set and an equipment parameter set; and S3, constructing a regulation and storage
pool model through the design parameter set, the module parameter set, the module coordinate set, the equipment parameter set and the equipment coordinate set. According to the method, the regulation and storage pool model can be output only by inputting the equipment parameter set in operation, so that the
design process is simplified, and the possibility of manual intervention and calculation errors is reduced. By adjusting the equipment parameter set, various types of regulation and storage pool models can be obtained, the design flexibility and customizability are greatly improved, and an optimal regulation and storage pool design scheme can be quickly generated according to different regions and different requirements.