Small-size accropode prefabricated construction method based on small collapsed slump concrete pouring
A construction method and concrete technology, which are applied in manufacturing tools, ceramic molding machines, coastline protection, etc., can solve the problems that the mixing capacity of the mixer cannot be fully utilized, the efficiency of the concrete tanker cannot be fully utilized, and the concrete slump is large. The effect of improving construction quality and reducing construction cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] In order to make the object, technical solution and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0030] The present invention utilizes the combined transportation of dump truck + ash hopper + loader + platform trolley and the ash-loading method to carry out prefabricated construction of small twisted king blocks below 5 tons. The specific construction method is as follows, and the slump of the concrete used is 30-50 mm; The prefabrication method based on above-mentioned twisted king block comprises the following steps;
[0031] 1) Concrete mix ratio design, the slump is controlled at 30-50mm;
[0032] 2) Formwork: support several twisted king block templates on the strip bottom tire; ensure that the centers of several...
PUM
| Property | Measurement | Unit |
|---|---|---|
| slump | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


