Small-size accropode prefabricated construction method based on small collapsed slump concrete pouring

A construction method and concrete technology, which are applied in manufacturing tools, ceramic molding machines, coastline protection, etc., can solve the problems that the mixing capacity of the mixer cannot be fully utilized, the efficiency of the concrete tanker cannot be fully utilized, and the concrete slump is large. The effect of improving construction quality and reducing construction cost

Inactive Publication Date: 2019-11-19
CCCC TIANJIN DREDGING HARBOR CONSTR ENG
View PDF3 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The twisted king block is a commonly used component in hydraulic face protection. In actual production, concrete is poured on the prefabricated twisted king block formwork, and the maintenance is carried out according to the maintenance requirements of concrete products. During the curing period, the formwork can be disassembled to make the twisted king block. King block; currently, concrete tank trucks are used to transport concrete during the production of twisted king blocks. The concrete slump is relatively large, and the concrete surface is prone to produce too much laitance, and the efficiency of short-distance transportation in a fixed prefabrication site cannot be exerted by using concrete tank trucks. , and the cost is high; using the loader alone for transportation, the single transportation volume is small, the transportation efficiency is low, and the mixing capacity of the mixer cannot be fully utilized

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Small-size accropode prefabricated construction method based on small collapsed slump concrete pouring
  • Small-size accropode prefabricated construction method based on small collapsed slump concrete pouring
  • Small-size accropode prefabricated construction method based on small collapsed slump concrete pouring

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] In order to make the object, technical solution and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0030] The present invention utilizes the combined transportation of dump truck + ash hopper + loader + platform trolley and the ash-loading method to carry out prefabricated construction of small twisted king blocks below 5 tons. The specific construction method is as follows, and the slump of the concrete used is 30-50 mm; The prefabrication method based on above-mentioned twisted king block comprises the following steps;

[0031] 1) Concrete mix ratio design, the slump is controlled at 30-50mm;

[0032] 2) Formwork: support several twisted king block templates on the strip bottom tire; ensure that the centers of several...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
slumpaaaaaaaaaa
Login to View More

Abstract

The invention discloses a small-size accropode prefabricated construction method based on small collapsed slump concrete pouring. The small-size accropode is below 5t, and the collapsed slump of the used concrete is 30-50mm. The small-size accropode prefabricated construction method comprises the following steps: 1, preparing concrete; 2, erecting formwork: accropode templates are erected on a long-strip shaped bottom tyre in the same direction; 3, placing a pouring platform trolley; 4, transporting concrete to a concrete construction site through a dump truck; 5, pouring the concrete into anash bucket through the dump truck; 6, utilizing a loader to transfer the concrete onto the pouring platform trolley; 7, pouring in a layered manner: discharging ash in three to four layers, and feeding concrete in a die along an ash discharging hole through human assistance; 8, pouring the prefabricated accropode templates one by one; and 9, carrying out maintenance. According to the small-size accropode prefabricated construction method, the combined transportation of the dump truck, the ash bucket, the loader and the platform trolley and ash discharging manner are utilized, so that the construction cost is greatly reduced, the construction quality is improved, and the construction progress is accelerated.

Description

technical field [0001] The invention belongs to the technical field of construction of twisted king blocks for hydraulic face protection, and in particular relates to a prefabricated construction method for small twisted king blocks based on pouring concrete with small slump. Background technique [0002] The twisted king block is a commonly used component in hydraulic face protection. In actual production, concrete is poured on the prefabricated twisted king block formwork, and the maintenance is carried out according to the maintenance requirements of concrete products. During the curing period, the formwork can be disassembled to make the twisted king block. King block; currently, concrete tank trucks are used to transport concrete during the production of twisted king blocks. The concrete slump is relatively large, and the concrete surface is prone to produce too much laitance, and the efficiency of short-distance transportation in a fixed prefabrication site cannot be ex...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): B28B1/04B28B7/22B28B11/24E02B3/14
CPCB28B1/045B28B7/22B28B11/245E02B3/14
Inventor 殷立中邹杨张宇刘文王瑞新
Owner CCCC TIANJIN DREDGING HARBOR CONSTR ENG