Method for transforming power distribution network in rural alley
A technology for power distribution network and rural areas, applied in the installation of cables, electrical components, cable installation devices, etc., can solve the problems of long commissioning cycle of new lines, destruction of ancient village ruins, mixing of new lines and old lines, etc., to save road surface. The effect of restoration costs and youth compensation costs, shortened construction period, and less civil works
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0008] A method for transforming the distribution network in rural alleys, which is realized by the following steps: 1) First grid the lines in the station area, that is, divide the lines in the station area into several grids according to the rural geographical environment and the distribution of low-voltage lines Grid, the low-voltage lines in the grid can be interconnected, choose a grid in the station area, (before construction, the technicians will consider all factors to select a first construction area); 2) Remove the old line; 3) Excavate The foundation of the old pole; 4) Remove the old pole; 5) Set up a new pole at the original position of the old pole; 6) Set up the fittings for the new pole; 7) Erection of a new line.
[0009] In step 2), pre-secure the old poles before removing the old wiring. This is because when removing the old lines, it will inevitably cause the old poles to loosen. In order to avoid unnecessary troubles, the old poles should be fixed in advan...