A Synchronous Construction Method for Reinforced Concrete with Supporting Beams and Floor Slabs in Deep Foundation Pit
A construction method and synchronous construction technology, which can be used in infrastructure engineering, excavation, artificial islands, etc., can solve the problems of large amount of earth excavation and poor connection quality, and achieve the effect of reducing the amount of excavation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] This embodiment is a preferred implementation mode of the present invention, and other principles and basic structures that are the same or similar to this embodiment are within the protection scope of the present invention.
[0035] It should be noted that when an element is referred to as being “fixed” or “disposed on” another element, it may be directly on the other element or be indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0036] It is to be understood that the terms "length", "width", "top", "bottom", "front", "rear", "left", "right", "vertical", "horizontal", "top" , "bottom", "inner", "outer" and other indicated orientations or positional relationships are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simp...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


