Concrete pouring construction method with lagging and synchronous construction on the same floor of a house building
A technology of simultaneous construction and construction method, applied in the direction of construction, building structure, formwork/formwork/work frame, etc., can solve the problem of dismantling the formwork, reduce the workload, reduce the connection materials and procedures, and save labor. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0032] Please refer to Figure 1-4, a construction method of concrete pouring with lagging and synchronous construction on the same floor of a house building, including:
[0033] (1) Fix the wall reinforcement: tie the N+1th layer wall reinforcement 2 on the formwork supporting platform of the Nth layer wall 1;
[0034] (2) Formwork support; after the wall reinforcement is tied, the large formwork system on both sides of the Nth floor wall is hoisted to the N+1...