Three-level network of passenger railway in checkerboard format
A format, chessboard technology, applied in railway car body parts, roads, transportation and packaging, etc., can solve the problems of cumbersome train schedule arrangement, huge economic differences and unbalanced interests, interests disputes, etc., to achieve easy understanding, efficient design, saving effect of time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] see Figure 1-Figure 5, the present invention provides the following technical solutions: a three-level passenger railway network in a checkerboard format, including a first-level site 1, a second-level site 2, a third-level site 3, a transfer passage platform 4 between a first-level site on the ground and a first-level site in the air, First-level site 1 will be built on the ground in order from left to right, platform 1 111T of first-level ground site, track 111G of first-level ground site, platform 2 112T of first-level ground site, and platform 2 of first-level ground site Track 112G, green isolation belt 115 in the middle of the first-level ground site, No. 3 track 113G for the first-level ground site, No. 3 platform 113T for the first-level ground site, No. 4 track 114G for the first-level ground site, platform 4 for the first-level ground site 114T, the air platform of the first-level site 1 is built in sequence from one side to the first platform 121T of the fir...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


