A method of accurately laying out the initial lead rope of the ground wire of the transmission line into the pulley groove
A technology for transmission lines and pulley grooves, which is applied in the direction of overhead lines/cable equipment, etc., can solve the problems of undiscovered patent documents, etc., and achieve the effects of high construction efficiency, saving labor costs, and improving construction safety.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The present invention will be further described in detail below through the specific examples, the following examples are only descriptive, not restrictive, and cannot limit the protection scope of the present invention with this.
[0021] A method for accurately laying out the initial lead rope of a transmission line ground wire into a pulley groove, characterized in that: the steps of the method are:
[0022] 1) Installation of the reserved connection rope at the top of the tower: after the iron tower 1 is assembled, while hanging the porcelain vase 3, fix the two ends of the reserved connection rope 2 at the top of the tower to the lower end of the porcelain vase;
[0023] 2) Installation and transportation of the connecting rope reserved for the pulley: Before lifting the pulley 7 on the ground, bundle the initial rope fixed groove rope 9 on the middle pulley 10, fix the end of the fixed groove rope on the pulley spoke 11 of the edge pulley, and pre-install the pulle...