Pre-grouting reinforcement technology for ground construction of structural fracture zone of mining working face

A technology for excavating working face and crushing zone, which is applied in underground chambers, mining equipment, earth-moving drilling, etc., can solve the problems of poor working environment on the construction site, limited slurry diffusion distance, and inability to use large-scale equipment, etc., to improve the construction environment. , The effect of improving workers' construction environment, equipment and materials from a wide range of sources

Inactive Publication Date: 2020-04-28
BEIJING CHINA COAL MINE ENG CO LTD +1
View PDF6 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Disadvantages: ①During grouting construction, the excavation process of the working face is completely stopped. If the cracks are very developed, it is necessary to construct a grout stop pad or a grout stop wall, resulting in a very low roadway excavation efficiency; ②The depth of the grouting drilling is shallow, and the reinforcement range It is very small, and at the same time, the space of the working face is limited, and large-scale equipment cannot be used. The grouting pressure is small, and the grout diffusion distance is limited;
④The working environment at the construction site is poor and there are many unsafe hidden dangers

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pre-grouting reinforcement technology for ground construction of structural fracture zone of mining working face
  • Pre-grouting reinforcement technology for ground construction of structural fracture zone of mining working face
  • Pre-grouting reinforcement technology for ground construction of structural fracture zone of mining working face

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] The pre-grouting reinforcement process for ground construction in the fractured zone of the excavation working face in this embodiment includes the following steps: (1) Drilling site foundation construction; the drilling rig foundation needs to be built on the ground before the drilling rig is installed. The foundation of the drilling rig is required to be flat and firm to prevent the drilling tower from skewing. When constructing the foundation of the drilling rig, mud grooves and mud circulation pools for processing cuttings should be reserved, and the mud pump foundation should be well built. One drilling rig is arranged on the ground along the axis of the treatment area. When arranging the drilling rig on the ground, factors such as buildings (structures), topography and landform should be considered, and the drilling rig should be inserted as much as possible to avoid affecting the normal production of the mine.

[0041] (2) Drilling of the straight hole section 4 a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
particle diameteraaaaaaaaaa
thicknessaaaaaaaaaa
Login to view more

Abstract

The invention discloses a pre-grouting reinforcement technology for the ground construction of a structural fracture zone of a mining working face. The pre-grouting reinforcement technology comprisesthe following steps of: step (1). performing foundation construction at a drill site; step (2). drilling a straight hole section, and lowering and fixing a first-level casing pipe; step (3). drillinga main branch hole bedding section and grouting, and completing the construction of a main branch hole building angle section and the main branch hole bedding section; and step (4). repeating the step(3) and the step (4), and completing the construction of secondary branch holes one by one. Before the construction of the underground fully mechanized coal mining face, a drilling machine is used onthe ground for drilling, and drills a horizontal grouting hole by using a directional technology; a ground surface grouting pump is used for injecting grout into a stratum rock mass where a fracturedroof of the fully mechanized coal mining face is located, so that the advance reinforcing treatment of the rock mass in the fracture zone of the roof is realized, the construction environment duringthe open-off cut and the working face mining is improved, and the construction progress of the roadway is accelerated. The pre-grouting reinforcement technology has high safety, improves the construction environment of workers, has less pollution to the environment, and is an initiative roof reinforcement technology.

Description

technical field [0001] The invention relates to the technical field of treating broken zones in coal mines and other mines. Specifically, it is a pre-grouting reinforcement process for ground construction in the structurally broken zone of the mining face. Background technique [0002] During the mining process of the fully mechanized mining face, the geological structure is an important factor affecting its safety and efficiency. Especially when a fault is encountered, the roof is broken, the coal seam mining line is difficult to control, and accidents such as slabs and roof fall are prone to occur. Large deformation of the rock, failure of support methods and other damages have a great impact on safe production. When the fully mechanized mining face encounters a fault with a large drop under the condition of a large dip angle, in order to ensure construction safety, it is often necessary to re-cut the hole or Partial eye patching, moving the working face across the struct...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D11/10E21B7/06E21B7/20E21B47/022C04B28/04C04B28/26C04B111/70
CPCC04B28/04C04B28/26C04B2111/00724C04B2111/70E21B7/06E21B7/20E21B47/022E21D11/105C04B22/124C04B24/122C04B14/10C04B7/02
Inventor 邓昀王志晓李建田乐张浩孙晓宇高晓耕王桦杨雪黄超安许良李忠凯陈龙李为琦戴亚男陈君刘书杰杨明李生生
Owner BEIJING CHINA COAL MINE ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products