Flood Calculation Method Based on Non-management Protection Dam Burst Prevention

A calculation method and technology of check dams, applied in the direction of design optimization/simulation, etc., can solve problems affecting the rationality of design floods, unspecified dam system construction, dam failure, etc.

Active Publication Date: 2021-12-14
YELLOW RIVER ENG CONSULTING
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The existing check dam design standard is once in 10 to 50 years. The frequency analysis method used to calculate the design flood of this standard has a probability of dam failure, that is, the occurrence of floods exceeding the flood control standard of the check dam, the possibility of dam failure very big
And because the check dam is composed of dam systems connected in series up and down, and there is no technical specification and flood control standard for the construction of the dam system. For a long time, the check dam has been constructed as a single dam, and the flood impact of the upstream dam group during design And whether the combined consideration is comprehensive also directly affects the rationality of the design flood

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Flood Calculation Method Based on Non-management Protection Dam Burst Prevention
  • Flood Calculation Method Based on Non-management Protection Dam Burst Prevention
  • Flood Calculation Method Based on Non-management Protection Dam Burst Prevention

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0033] In describing the present invention, it should be understood that the terms "center", "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", " The orientations or positional relationships indicated by "vertical", "horizontal", "top", "bottom", "inner" and "outer" are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a flood calculation method based on management-free silt protection dam failure prevention. Firstly, it is judged whether there are similar results. If there are similar results, the PMP is obtained directly. If not, the characteristic elements or element combinations of the PMF calculation are discriminated, and passed Analysis of the physical causes of rainstorms To formulate a rainstorm model, the rainstorm model is divided into local models and displacement models, maximize the rainstorm model, select water vapor factors and dynamic factors, and use the same type of rainstorm data as the selected rainstorm model for analysis Selected, the total amount of PMP rainstorm and the distribution of time and space of the dam system are obtained, and finally the PMF calculation of the dam system construction is considered, and the PMF of the engineering design section is obtained from the PMP through the flow calculation and confluence calculation, and a set of anti-rupture design concepts is established. The advanced check dam flood calculation system uses the maximum possible flood in the discharge design and engineering stability calculation of the check dam project, which can fundamentally solve the problem of dam failure caused by excessive flood.

Description

technical field [0001] The invention relates to the field of engineering hydrology, in particular to a flood calculation method based on the management-free silt protection dam breakage prevention. Background technique [0002] At present, the design standards for small-scale reservoirs are applied to the check dam project. Generally, the backbone dam (large) is once in 30 to 50 years, and the ordinary dam (medium and small) is once in 10 to 30 years. The flood control standard of the check dam is relatively low. The overall flood control capability is weak; second, due to investment and technical constraints, most of the check dams do not have spillways and other discharge structures, and there are hidden dangers to flood control safety when excessive floods occur, and there is even a risk of collapse; third, check dams The watershed area controlled by the project is relatively small, and most of them are located in the Loess Plateau area, where excessive floods caused by l...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06F30/20
Inventor 张金良苏茂林宋伟华张远生李超群贺顺德
Owner YELLOW RIVER ENG CONSULTING
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products